Town of Harpswell Harpswell
Town of Harpswell

Download

Word, as adoptedXML, as adopted

Town of Harpswell Basic Land Use Ordinance

Section 1Purpose

§ 1

The purpose of this Ordinance is to provide for reasonable and orderly development within all areas of the Town while protecting the health, safety, and welfare of its citizens.

This Ordinance seeks to preserve the character of Harpswell as a residential, fishing, and vacation community with clean waters, healthy wetland functions and wildlife habitats, scenic attractiveness and a sense of openness. It seeks also to preserve to the maximum extent possible, traditional rights of landowners to use their lands as they desire, while at the same time protecting nearby residential owners from excessive conflicting uses that might degrade property values and damage the attractiveness of the community to the detriment of all.

Section 2Authority

§ 2

This Ordinance is adopted under powers granted to the town by 30-A M.R.S.A. §§ 3001 and 4352, as may be amended from time to time.

Throughout this Ordinance there are "Citizen's Notes". These notes shall not be considered part of this Ordinance as adopted by the Town, but shall only be considered as aids for citizens to use this Ordinance and as guides to the intent of Ordinance provisions and their proper interpretation.

Section Titles of this Ordinance do not constitute official ordinance language. These Titles shall only be considered as an aid for citizens using this Ordinance.

Section 3Applicability

§ 3

This Ordinance applies to all dwellings, accessory structures, and uses that are not subject to Shoreland Zoning. The provisions of this Ordinance pertaining to nonconformance apply to all nonconforming, nonresidential structures, developments, and uses not subject to the Shoreland Zoning Ordinance. In addition, the procedural and administrative provisions contained in this Ordinance govern the administration of all the Town's land use ordinances. Insofar as this Ordinance is inconsistent with state law as it relates to mobile home parks, the provisions of 30-A M.R.S.A. § 4358, as may be amended from time to time, shall prevail.

Citizen’s Note: For creation of subdivisions, see Subdivision Ordinance. For activities in the Shoreland Zone requiring permits, see Shoreland Zoning Ordinance. Multi-family dwellings and nonresidential development, wherever located, are also subject to the provisions of the Site Plan Review Ordinance.

Section 4Effective Date

§ 4

The effective date of this Ordinance is September 15, 1997.

Section 5Availability

§ 5

A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible to any member of the public. Copies shall be made available to the public at reasonable cost at the expense of the person making the request. Notice of availability of this Ordinance shall be posted.

Section 6Severability

§ 6

Should any section or provision of this Ordinance be declared by the courts to be invalid, such decision shall not invalidate any other section or provision of the Ordinance.

Section 7Conflicts with Other Ordinances

§ 7

Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of this Ordinance or of any other Ordinance, regulation or statute, the more restrictive provision shall control unless state law provides otherwise.

Section 8Amendments

§ 8

Amendments may be made by a majority vote of the Town at any Harpswell Town Meeting and shall take effect upon enactment unless otherwise specified.

Amendments may be initiated by a majority vote of the Planning Board, by a majority vote of the Board of Selectmen or by written petition signed by a number of registered voters equal to ten percent (10%) of Harpswell voters voting in the last gubernatorial election.

Section 9Land Use Requirements

§ 9

Except as hereinafter specified, no structure or land shall hereafter be used or occupied, and no structure or part thereof shall hereafter be erected, constructed, expanded, moved, altered, replaced and no new lot shall be created except in conformity with all of the regulations herein specified for the area or district in which it is located, unless a variance is granted by the Board of Appeals.

Section 10Nonconformance

§ 10

10.1.

Purpose. It is the intent of this Ordinance to promote land use conformities, except that lawful nonconforming conditions that existed before September 15, 1997 and the effective dates of any amendments to this Ordinance creating new nonconforming conditions shall be allowed to continue, subject to the requirements set forth in this section.

Citizen's Note: Nonconformance should not be considered illegal or unacceptable. Nonconformance means lots of record or uses that are grandfathered because they were in conformance with the standards in effect before the adoption of this Ordinance or any amendments creating new nonconforming conditions. The concerned party is encouraged to read through this Ordinance and contact a town official should a question arise. If the property is located in the Shoreland Zone, see the relevant provisions in the Shoreland Zoning Ordinance.

10.2.

General.

10.2.1.

Transfer of Ownership. Nonconforming structures, lots and uses may be transferred, and the new owner may continue the nonconforming use or continue to use the nonconforming structure or lot, subject to the provisions of this Ordinance.

10.2.2.

Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and maintenance of nonconforming uses and structures including repair or renovations that do not involve expansion of the nonconforming use or structure, and such other changes in a nonconforming use or structure as Federal, State, or local building and safety codes may require.

Citizen's Note: See Definitions Addendum for the definitions of nonconforming structures, nonconforming uses, and nonconforming lots.

10.3.

Nonconforming Structures

10.3.1.

Expansions. A nonconforming structure may be added to or expanded after obtaining a permit from the same permitting authority as that for a new structure, if such addition or expansion does not increase the nonconformity of the structure. For the purposes of this Ordinance, an increase to the nonconformity of the structure shall mean:

·

any expansion towards a property line or road that decreases the shortest existing nonconforming setback distance from property line or road, or

·

any expansion which would cause the total area covered by the structures, driveways, parking lots, and other impermeable surfaces to exceed twenty percent (20%) of the total lot area, or

·

any expansion which would cause the structure to exceed the height limits of this Ordinance.

The shortest existing nonconforming setback distance from a property line or a road may not be measured from an existing area, such as a small patio, terrace, landing, or small set of stairs, used mainly for access to a structure.

Citizen’s Note: It should be understood that small patios, terraces, landings, or small sets of stairs within minimum setbacks do not change the setback of the adjacent structure and cannot be used to justify expansion of any other part of the structure into that setback.

10.3.1.1.

After September 15, 1997, or the effective date of any amendment to this Ordinance creating any new nonconforming conditions, if any portion of an existing structure is less than the required setback from the road or property line, that portion of the structure shall not be expanded in floor area or volume, by more than thirty percent (30%), during the lifetime of the structure.

10.3.1.2.

Construction of a foundation beneath an existing building that is nonconforming as to setbacks shall not be considered an expansion of the structure provided that:

10.3.1.2.1.

The foundation shall not extend beyond the exterior dimension of the building as it existed on September 15, 1997 or the effective date of any amendment to this Ordinance creating any new nonconforming condition, or as expanded in accordance with Section 10.3.1.1.

Citizen's Note: Disputed decisions may be appealed to the Board of Appeals.

10.3.2.

Relocation, Reconstruction, or Replacement

10.3.2.1.

Relocation. A nonconforming structure may be relocated within the boundaries of the parcel on which the structure is located provided that the site of relocation conforms to all setback requirements to the greatest practical extent as determined by the CEO, and provided that the applicant demonstrates that the present sub-surface wastewater disposal system meets the requirements of State law and the State of Maine Subsurface Wastewater Disposal Rules, or that a new system can be installed in compliance with the law and said Rules. In no case shall a structure be relocated in a manner that causes the structure to be more nonconforming. Any relocation approved by the CEO pursuant to this subsection shall be endorsed in writing by the CEO.

10.3.2.2.

Reconstruction or Replacement. Any nonconforming structure that is located less than the required setback from a property line or road and which is removed, damaged, or destroyed by more than fifty percent (50%) of the assessed value of the structure, as adjusted by the Town’s assessment ratio as most recently certified by the Assessors to the State of Maine, before such damage, destruction, or removal, as determined by the Assessors or their designee in consultation with the CEO, may be reconstructed or replaced provided that a permit is obtained within one (l) year of the date of said damage, destruction, or removal, and provided such replacement or reconstruction is in compliance with the setback requirements to the greatest practical extent as determined by the CEO in accordance with the purposes of this Ordinance; provided, however, that any nonconforming structure that is located less than the required setback from a property line or road and that is damaged or destroyed by fire or any cause other than the willful act or negligence of the owner or the owners agent may be reconstructed on the same footprint as the structure that was destroyed. In no case shall a structure be reconstructed or replaced so as to increase its nonconformity. Any reconstruction or replacement approved by the CEO pursuant to this subsection shall be endorsed in writing by the CEO.

10.3.2.3

Authority of Planning Board to Exercise Jurisdiction over an Application. Except as provided for below, for any application for relocation of a nonconforming structure, or for the reconstruction or replacement of a nonconforming structure that was removed, damaged, or destroyed by more than fifty percent (50%) of the adjusted assessed value of the structure, made under Section 10.3.2, the CEO shall provide written notice to the Planning Board and all property owners within two hundred fifty (250) feet of the property as listed on the Town’s most recent assessing records that a relocation, reconstruction or replacement application has been received and is being reviewed. The opportunity for the Planning Board to take jurisdiction under this provision and to receive notice shall not apply in the following situations:

(a)

The relocation, replacement, or reconstruction will be carried out such that the structure complies with all applicable setback requirements, or

(b)

The structure being relocated is an accessory structure that meets all the following requirements:

1)

The floor area of the existing nonconforming structure is less than two hundred (200) square feet,

2)

The floor area or volume of the structure will not be increased,

3)

The structure is and will continue to be accessory to the principal use of the property,

4)

The structure will not be served by water, and

5)

The structure has not been and will not be used for human habitation.

(c)

The structure being reconstructed or replaced is an accessory structure that meets all of the following requirements:

1)

The floor area of the existing nonconforming structure is less than two hundred (200) square feet,

2)

The floor area and volume of the replacement or reconstructed structure will not be larger than one hundred fifty percent (150%) of the floor area and volume of the existing structure,

3)

The existing structure is accessory to the principal use of the property and the replacement or reconstructed structure will continue to be so,

4)

The replacement or reconstructed structure will not be served by water, and

5)

The replacement or reconstructed structure will not be used for human habitation.

During that forty (40) day time period, the Planning Board may elect to exercise jurisdiction over the relocation, reconstruction or replacement application. The Planning Board’s review, if any, shall be governed by the same review standards as govern the CEO review. The CEO shall not issue any permit under this Section until the earlier of (a) forty (40) days after the date that the CEO provides such written notice to the Planning Board and all property owners within two hundred fifty (250) feet of the property as listed on the Town’s most recent assessing records or (b) the date the Planning Board declines to exercise jurisdiction over the application. Any relocation, reconstruction or replacement application approved by the Planning Board pursuant to this subsection shall be endorsed in writing. Failure of any property owner to receive the notice sent under this subsection does not invalidate any action taken by the CEO or Planning Board.

10.3.2.4.

Greatest Practical Extent Setback Factors. In determining whether the building relocation, reconstruction or replacement meets the setback to the greatest practical extent, the CEO or Planning Board, as applicable, shall consider the size of the lot, the slope of the land, the potential for soil erosion, the location of other structures on the property and on adjacent properties, the location of the septic systems and other on-site soils suitable for septic systems, and the type and amount of vegetation to be removed to accomplish the relocation.

10.4.

Nonconforming Lots

10.4.1.

Nonconforming lots whether located in legal subdivisions or elsewhere are subject to the provision of this section.

10.4.2.

Nonconforming Lots. A nonconforming lot of record as of September 15, 1997 or the effective date of any amendment to this Ordinance creating any new nonconforming conditions may be built upon, without the need for a variance, provided that such lot is in separate ownership and not contiguous with any other lot in the same ownership, and that all provisions of this Ordinance except lot size and frontage are met; provided, further, that reduced setback requirements may be applicable to those lots that meet the criteria set forth in Section 10.4.2.1. Variances relating to setback or other requirements not involving lot size or frontage shall be obtained by action of the Board of Appeals.

The status of a nonconforming lot of record shall not change as a result of realigning a common boundary line with the owner of a contiguous parcel of land, provided that (a) neither lot ends up more nonconforming after the transaction than it was prior to the transaction, as evidenced in writing by a land surveyor licensed to practice in Maine; (b) the parties cause copies of the recorded deeds to be submitted to the CEO within thirty (30) days of the recording of the deeds at the registry; and (c) no permits or approvals relating to such nonconforming lot shall be issued unless or until the applicant complies with subsections (a) and (b) herein.

10.4.2.1.

Setback Reduction for Small Nonconforming Lots. The setback of structures from lot lines may be reduced to five (5) feet and the setback of structures from traveled ways may be reduced to ten (10) feet in order to allow the expansion or construction of a structure to be used solely for one-unit residential purposes or an accessory structure appurtenant to it, provided that the following conditions are met:

(a)

The nonconforming lot in question was lawfully created prior to September 15, 1997 and is evidenced by a recorded deed or subdivision plan;

(b)

The lot meets the following size requirements:

(i)

less than one-quarter (¼) acre (i.e., less than 10,890 square feet) in size; and

(ii)

if, as determined by the Code Enforcement Office, less than one-half (1/2) of the eligible owner(s) of lots under Section 10.4.2.1(b)(i) do not apply for the reduced setback described herein within two (2) years of the adoption of this subsection, then owner(s) of lots less than one-half (1/2) acre (i.e. less than 21,780 square feet) in size may apply for the reduced setback established herein; provided, however, that no more than fifty percent (50%) of the total number of eligible lots will be permitted the reduced setbacks described herein;

(c)

The lot is not located in whole or in part within the Shoreland Zone;

(d)

There exist two (2) or more other nonconforming lots meeting the size requirement then applying under Section 10.4.2.1(b) that have been improved with one-unit residential uses within a five hundred (500) foot radius of the lot in question;

(e)

Neither Section 10.4.3 nor Section 10.4.4 apply to the lot; and

(f)

The owner or owners of the property located along the boundary line adjacent to which the setback reduction is requested consents in writing to the reduction; and

(g)

That any new structure constructed pursuant to this Section is consistent with the character of the local area in which it is to be situated, as determined by the Planning Board.

If a reduced setback is approved pursuant to this Section on previously unimproved lots, the impermeable surface coverage requirements set forth in Section 11.1.1 shall continue to apply.

If a reduced setback is approved pursuant to this Section on lots that have been previously improved with a structure, that structure shall not be expanded in floor area or volume, by thirty percent (30%) or more, during the lifetime of the structure, and the impermeable surface coverage requirement set forth in Section 11.1.1 shall not apply.

10.4.3.

Contiguous Built Lots. If two (2) or more contiguous lots or parcels are in a single or joint ownership of record as of September 15, l997 or the effective date of any amendment to this Ordinance creating any new nonconforming conditions if all or part of the lots do not meet the dimensional requirements of this Ordinance, and if a principal use or structure exists on each lot, the nonconforming lots may be conveyed separately or together, provided that the State Minimum Lot Size Law and Subsurface Wastewater Disposal Rules are complied with.

If two (2) or more principal uses or structures existed on a single lot of record as of September l5, l997 or the effective date of any amendment to this Ordinance creating new nonconforming conditions, each may be sold as a separate lot, provided that State Minimum Lot Size Law and Subsurface Wastewater Disposal Rules are complied with. When such lots are divided, each lot thus created must be as conforming as possible to the dimensional requirements of this Ordinance.

10.4.4.

Contiguous Lots - Vacant or Partially Built. If two (2) or more contiguous lots or parcels are in single or joint ownership of record at the time of or since September l5, l997 or the effective date of any amendment to this Ordinance creating new nonconforming conditions, if any of these lots do not individually meet the dimensional requirements of this Ordinance or subsequent amendments, and if one (1) or more of the lots are vacant or contain no principal structure, the lots shall be combined to the extent necessary to meet the dimensional requirements.

This provision shall not apply to two (2) or more contiguous lots, at least one (1) of which is nonconforming, owned by the same person or persons as of September 15, 1997 or the effective date of any amendment to this Ordinance creating new nonconforming conditions and recorded in the Registry of Deeds, if the lot is served by the public sewer, or can accommodate a subsurface sewage disposal system in conformance with the State of Maine Subsurface Wastewater Rules and:

10.4.4.1.

Each lot contains at least one hundred (100) feet of road frontage and at least twenty thousand (20,000) square feet of lot area; or

10.4.4.2.

Any lots that do not meet the frontage and lot size requirements of subparagraph 10.4.3. Are reconfigured or combined so that each new lot contains at least one hundred (100) feet of road frontage and twenty thousand (20,000) square feet of lot area.

10.4.5.

Creation of Nonconforming Lot(s) for Preservation or Conservation Purposes

An existing conforming lot or a nonconforming lot may be divided so as to create not more than two (2) lots, one (1) or both of which are nonconforming lots, provided that the Harpswell Planning Board finds that the following conditions are met:

10.4.5.1.

One (1) of the resulting lots is conveyed to a governmental body or a nonprofit tax exempt organization (preservation grantee) for conservation or preservation purposes.

10.4.5.2.

The division does not create or exacerbate a public health or safety problem on the nonconforming lot not to be conveyed to a preservation grantee (the remaining lot) to the extent that the remaining lot does not have adequate (as defined by the appropriate code) well and septic waste disposal options.

10.4.5.3.

If the lot conveyed to the preservation grantee is undeveloped land, or is to be returned to an undeveloped state, the deed or instrument of conveyance shall contain restrictions which require that the land be preserved or maintained in its natural state (although not necessarily "forever wild") in perpetuity for one (1) or more generally recognized purposes which benefit the natural, cultural, or architectural history of the Town or which preserves a diminishing or threatened place, parcel of land, resource, or habitat.

10.4.5.4.

If the lot conveyed to the preservation grantee contains a pre-existing structure or improvement, the structure or improvement must have a demonstrable historic, cultural or architectural importance and the deed or instrument of conveyance shall contain restrictions which require that the land and the improvements thereon be preserved and maintained so as to protect and preserve said historic, cultural or architectural importance. No structure on the lot conveyed to a preservation grantee pursuant to this section may be inhabited as a dwelling.

Section 11Standards

§ 11

11.1.

Minimum Lot Standards

AREAS OF TOWN NOT SUBJECT TO SHORELAND ZONING¹,²&³

AREAS LOCATED OUTSIDE OF A SUBDIVISIONAREAS LOCATED WITHIN A SUBDIVISION⁴
MIN. LOT SIZE (S.F.) PER DWELLING UNIT40,00080,000
ROAD FRONTAGE (FT)150³150⁵
PROPERTY LINE SETBACK (FT)See Section 11.3.1See Section 11.3.1
ROAD SETBACK (FT)See Section 11.3.1See Section 11.3.1
STRUCTURE HEIGHT (FT)3535
1.

For uses in the Shoreland Zone, see Sections 15.1 and 15.2 of the Shoreland Zoning Ordinance and the Site Plan Review Ordinance.

2.

Nonresidential development in these areas is governed by the Site Plan Review Ordinance.

3.

For any road serving more than two (2) lots or dwelling units, the road must comply with the requirements of the Town of Harpswell Road Ordinance. For any lot to which access is only by one (1) or more roads terminating at the lot, no minimum road frontage is required provided that access to any development on the lot is wide enough to accommodate emergency vehicles but in no event less than twelve (12) feet in width.

4.

The minimum lot size and road frontage requirements may be reduced for lots in subdivisions developed in accordance with the Flexible Lot Size Subdivision provisions of the Subdivision Ordinance.

5.

The frontage requirement for lots on a hammerhead or T-shaped turnaround for dead end roads in a subdivision may be reduced to fifty (50) feet where no future road is either feasible or provided for on the subdivision plan, provided that all of the requirements of the Town of Harpswell Road Ordinance are met.

6.

Notwithstanding the minimum lot size per dwelling unit requirement in the table, an existing one-unit residential structure with three or more bedrooms may be converted to a two-unit residential structure with a total number of bedrooms equal to or less than the number of bedrooms in the existing structure even if it is nonconforming with respect to the minimum lot area requirement if all of the following conditions are met:

a.

The structure is located on a lot that is not part of a subdivision;

b.

The one-unit residential structure was in existence on the lot as of April 1, 2024;

c.

Written evidence shall be provided to the Plumbing Inspector before the issuance of any permits needed to reconfigure the structure that a subsurface wastewater disposal system(s) to serve both units is or will be sized to meet the design sewage flows for the two units in accordance with the Maine Subsurface Wastewater Disposal Rules; and

d.

If an existing subsurface wastewater disposal system will be used, written evidence that the system is properly functioning shall be submitted to the Plumbing Inspector prior to the issuance of any permits needed to reconfigure the structure

11.1.1.

The total area covered by all structures, driveways, parking lots, and other impermeable surfaces shall not exceed twenty percent (20%) of the total area of the lot with the following exceptions:

11.1.1.1.

Lots in Flexible Lot Size subdivisions that have a lot area of less than 40,000 square feet may have up to 7,500 square feet of impermeable surface.

11.1.1.2.

Lots with a principal residential use utilizing green infrastructure and low impact development (LID) techniques may have up to twenty-five (25%) percent impermeable surface.

11.1.1.3.

Lots with a principal nonresidential use utilizing green infrastructure and low impact development (LID) techniques may have up to fifty (50%) percent impermeable surface.

11.1.2.

Lots located on opposite sides of a public or private road shall be considered each a separate tract or parcel of land unless such road was established by the owner of land on both sides thereof after September 22, 1971.

11.1.3.

The following land shall not be included in the calculation of the area of a lot for the purposes of meeting minimum lot size or other density or dimensional requirements:

11.1.3.1

Land below the minimum high water line of a great pond, stream, or tributary stream,

11.1.3.2

Land below the HAT of a coastal wetland,

11.1.3.3

Land below the upland edge of a freshwater wetland with a contiguous are of more than twenty thousand (20,000) square feet,

11.1.3.4

Land which is part of a road, or a transportation right-of-way, or easement serving more than two (2) lots, except rights-of-way or easements used exclusively for pedestrian access, and

11.1.3.5

Land created by the filling or draining of a great pond, stream, tributary stream, or coastal or freshwater wetland.

11.2.

Minimum Lot Frontage

11.2.1.

Off-Shore Island. Lots on off-shore islands not covered by Shoreland Zoning will be exempt from Frontage requirements.

11.3.

Principal and Accessory Structures

11.3.1.

Setback. All principal structures and expansions of existing principal structures shall be set back at least forty (40) feet from the edge of the traveled way and at least twenty (20) feet from all lot lines; provided, however, that if more than one (1) traveled way abuts a lot, the dwelling need only be set back from the traveled way that serves as access to the driveway for the lot. All accessory structures shall be set back at least twenty (20) feet from all lot lines or the edge of a traveled way, whichever is more restrictive. If the location of a property line along a traveled way is unknown, the setback for accessory structures shall be forty (40) feet from the edge of the traveled way.

11.3.1.1.

One accessory structure not to exceed eighty (80) square feet and not to exceed ten feet six inches (10’6”) in height may intrude up to ten (10) feet into a sideline or rear setback without the need for a variance if the CEO determines that the proposed location meets the setback requirements to the greatest practical extent as described in Section 10.3.2.4, has been consented to in writing by the property owner(s) abutting the lot line in question, and will meet all other requirements of the ordinance.

11.3.1.2.

One accessory structure not to exceed eighty (80) square feet and not to exceed ten feet six inches (10’6”) in height may intrude up to fifteen (15) feet into a sideline or rear setback without the need for a variance if the CEO determines that the structure will be accessory to a principal structure listed on the National Register of Historic Places, that the intrusion into the setback has been determined by the Maine Historic Preservation Commission to be necessary to maintain the historic character of the property, that the intrusion has been consented to in writing by the property owner(s) abutting the lot line in question, and the accessory structure will meet all other requirements of the ordinance.

11.3.2.

Height of Structures. All principal and accessory structures shall not exceed thirty-five (35) feet in height. All expansions of principal and accessory structures that increase the footprint of the structure shall not exceed thirty-five (35) feet in height. For any principal or accessory structure existing as of March 10, 2007 that lawfully exceeds thirty-five (35) feet in height, such structure may be expanded without the need for a variance provided that (a) the expansion does not increase the footprint of the structure; and (b) the expansion does not exceed the greatest height of the existing structure. Expansions of nonconforming structures must comply with all other expansion limitations of this Ordinance. The CEO shall review any proposed expansion of a structure and shall determine, in writing, whether the requirements of this subsection are met prior to the issuance of any permit. This subsection does not apply to structures having no floor area, such as transmission towers, windmills, antennas and similar structures.

The height of a structure shall be determined by using the definition of height in the Definitions Addendum. Notwithstanding the preceding sentence, cupolas or similar portions of a structure having no floor area and exceeding any of the following dimensions (a) a side wall of sixteen (16) square feet; (b) a side wall of four (4) feet in height; (c) sixteen (16) square feet of horizontal area; or (d) a twelve/twelve (12/12) roof pitch, shall be included in the measurement of the height of a structure.

If the measurement cannot be made from the original grade where the structure is to be located, the CEO shall establish a reasonable approximation of original grade for the purposes of determining height.

11.3.3.

Accessory Temporary Living Accommodation. During the construction or reconstruction of a one-unit residential use, a property owner may place an accessory temporary living accommodation on the lot in conformance with this section. Prior to installing the accessory temporary living accommodation on the lot, the property owner must obtain a temporary certificate of compliance from the Code Enforcement Officer (CEO). The CEO shall issue the temporary certificate only if he/she finds that all of the provisions of this section have been met. The temporary certificate of compliance shall be for a period of not more than twelve (12) months. The owner may apply for up to two (2) twelve (12) month renewals of the temporary compliance permit and the CEO shall approve such renewals only if he/she finds that the property owner is in compliance with all of the provisions of this section.

The placement and use of the accessory temporary living accommodation shall conform to all of the following requirements:

11.3.3.1.

The accessory temporary living accommodation shall be a travel trailer, recreational vehicle, tent, or other similar enclosure that is not permanently attached to the ground.

11.3.3.2.

The temporary living accommodation shall have a maximum of three hundred (300) square feet of area that can be occupied.

11.3.3.3.

The accommodation shall be used only for the temporary living quarters of the property owner and her/his immediate family while construction is in progress on the home.

11.3.3.4.

The temporary living accommodation shall be located on the lot in full conformance with the shoreland and property line setbacks.

11.3.3.5.

The temporary living accommodation shall not be located on any type of permanent foundation and if the accommodation is a travel trailer, recreational vehicle, or similar mobile enclosure with integral wheels, the wheels shall remain on the vehicle while it is on the lot.

11.3.3.6.

The owner shall prepare a written sewage disposal plan describing the proposed method and location of provisions for sewage disposal. The plan must be approved by the local plumbing inspector. When disposal is off-site, written authorization from the receiving facility or land owner is required.

A property owner who has been issued a temporary certificate of compliance for the placement of an accessory temporary living accommodation on the lot shall remove the temporary living accommodation within fifteen (15) days of being notified by the CEO in writing that the use is not in compliance with the standards and/or that the temporary certificate of compliance has expired, or shall disconnect the unit from all permanent utilities and sewage disposal provisions within fifteen (15) days of receiving a certificate of compliance for the new or replacement home. Failure to remove the accessory temporary living accommodation or disconnect it from all permanent utilities and sewage disposal provisions as required shall constitute a violation of this Ordinance subject to the penalties described in Section 13.6 herein.

11.4.

Subsurface Waste Disposal

11.4.1.

All subsurface wastewater disposal systems shall be permitted and installed in conformance with the State of Maine Subsurface Wastewater Disposal Rules and to minimize adverse impacts on ground water quality.

11.4.2.

All new, replacement, renovated, or expanded structures or uses generating waste, shall provide evidence of the type specified in Section 13.3.4 that an adequate wastewater disposal system can be constructed or that an adequate wastewater disposal system already exists.

11.4.3.

Existing Use - Continuation of Use. The use of any legal system that exists on the effective date of this Ordinance, or which had previously been approved for installation, may be continued without change except as may be specifically covered by the Maine State Plumbing Code or deemed necessary by the plumbing inspector, for the general safety and welfare of the occupants and the public.

11.4.4.

Change in Use - It shall be unlawful to make any change in the use of any system, or to erect, enlarge, or change the use of a structure that uses an existing system without the approval of the plumbing inspector and certification that such change does not result in any hazard to public health, safety, and welfare.

11.4.5.

The minimum setback for new subsurface wastewater disposal fields shall be not less than one hundred (100) horizontal feet from the maximum high water line of a perennial water body. The minimum setback distance from the water body for new subsurface wastewater disposal fields shall not be reduced by variance.

11.4.6.

Replacement systems shall meet the standards for replacement systems as contained in the Maine Subsurface Wastewater Disposal Rules.

11.4.7.

The owner of the proposed system may locate the system or components partially on property not owned or controlled by the owner of the system, provided that the owner of the property where the system is to be located executes an easement in perpetuity for the construction, operation, replacement, and maintenance of the system, giving the system’s owner authorization to cross any land or right-of-way between the two parcels. The easement shall be filed and cross-referenced in the Registry of Deeds and the Code Enforcement Office prior to issuance of a disposal system permit. The easement shall provide sufficient buffer around the disposal field and fill material extensions for future replacement and maintenance of the system.

Citizens Note: The Town recommends that all owners of new and replacement systems install low-flow flushes and shower heads.

11.5.

Roads and Driveways. Roads serving more than two (2) lots or dwelling units must comply with the requirements of the Town of Harpswell Road Ordinance.

Citizen's Note: Roads in the Shoreland Zone are also governed by the Shoreland Zoning Ordinance. Any owners of lots fronting on State Route 123, State Route 24, the Cundy's Harbor Road, or the Mountain Road are encouraged to share driveways to reduce curb cuts and improve safety. A curb cut must be approved by Maine DOT and the Town Road Commissioner.

11.6.

Storm Water Runoff

11.6.1.

All new construction and development shall be designed to minimize storm water runoff from the site in excess of the natural pre-development conditions. Where possible, green infrastructure and low impact development (LID) techniques (rain gardens, infiltration planters, bioswales), as well as existing natural runoff control features (berms, swales, terraces, and wooded areas) shall be retained in order to reduce runoff and encourage infiltration of stormwater.

11.6.2.

Storm water runoff control systems shall be maintained as necessary to ensure proper functioning.

11.7.

Campgrounds. Campgrounds shall be subject to the same provisions as those set forth in Section 15.4 of the Shoreland Zoning Ordinance, as may be amended from time to time.

11.8.

Individual Private Campsites and Temporary Residential Use. Individual private campsites and temporary residential uses shall be subject to the same provisions as those set forth in Section 15.5 of the Shoreland Zoning Ordinance, as may be amended from time to time.

11.9.

Agriculture. Agriculture shall be subject to the same provisions as those set forth in Section 15.13 of the Shoreland Zoning Ordinance, as may be amended from time to time.

11.10.

Earth Moving, Erosion and Sedimentation Control. Earth moving, erosion and sedimentation control shall be subject to the same provisions as those set forth in Section 15.16 of the Shoreland Zoning Ordinance, as may be amended from time to time.

11.11.

Water Quality Protection. No activity shall deposit on or into the ground or discharge to the water of the State any pollutant that, by itself or in combination with other activities or substances will impair designated uses or the water classification of a water body. No activity shall locate, store, discharge, or permit the discharge of any treated, untreated, or inadequately treated liquid, gaseous, or solid materials of such nature, quantity, obnoxiousness, toxicity, or temperature that run off, seep, percolate, or wash into surface or ground waters so as to contaminate, pollute, or harm such waters or cause nuisances.

11.12.

Accessory Dwelling Unit (ADU). One accessory dwelling unit (ADU) may be added to any lot with a principal one-unit residential structure without having to meet the minimum lot area per dwelling unit requirement for the ADU, provided that it meets all of the following standards:

(a)

The owner of the property shall occupy either the principal dwelling unit or the ADU;

(b)

Any ADU within or attached to the principal structure or within an accessory or freestanding structure shall have a maximum of seven hundred fifty (750) square feet of floor area;

(c)

If the ADU is located within or attached to the principal structure, the design of the ADU, including its entrance from the outside, shall maintain the appearance of a one-unit residential structure;

(d)

Any addition to the principal structure or an accessory structure to create the ADU shall comply with the property line and road setbacks. If the principal or accessory structure is nonconforming with respect to any setback, the addition shall not increase the nonconformity;

(f)

The location of a freestanding structure on the property for use as an ADU shall comply with the property line and road setbacks and shall not obscure the front of the principal structure;

(g)

Written evidence shall be provided to the Plumbing Inspector before the issuance of any permits needed to create the ADU that a subsurface wastewater disposal system(s) to serve both the principal unit and the ADU is or will be sized to meet the design sewage flows for the two units in accordance with the Maine Subsurface Wastewater Disposal Rules; and

(h)

If an existing subsurface wastewater disposal system will be used, written evidence that the system is properly functioning shall be submitted to the Plumbing Inspector prior to the issuance of any permits needed to create the ADU.

11.13.

Utilities and Essential Services. Where feasible, the installation of essential services shall be limited to existing public ways and existing service corridors and above ground facilities must be located so as to avoid crossing open areas and scenic views as identified in the Comprehensive Plan.

11.14.

Soils. All land uses shall be located on soils in or upon which proposed uses or structures can be established or maintained without causing adverse environmental impacts, including severe erosion, mass soil movement, improper drainage, and water pollution, whether during or after construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial development and other similar intensive land uses shall require a soils report based in an on-site investigation and be prepared by state-certified professionals. Certified persons may include Maine Certified Soil Scientists, and Maine State Certified Geologists. The report shall include an analysis of the characteristics of the soil and surrounding land and water areas, maximum ground water elevation, presence of ledge, drainage conditions, and other pertinent data which the evaluator deems appropriate. The soils report shall include recommendations for a proposed use to counteract soil limitations where they exist.

11.15.

Vegetative Buffers. Within seventy-five (75) feet, horizontal distance, from the maximum high water line of a tributary stream, the clearing of existing vegetation in areas other than the Shoreland Zone, shall be conducted in accordance with the following provisions.

11.15.1.

There shall be no clearcut openings greater than two hundred fifty (250) square feet in the forest canopy as measured from the outer limits of the tree crown, and a well-distributed stand of trees and other vegetation, including existing ground cover, shall be maintained. Selective cutting of trees within the buffer strip is permitted provided that a well distributed stand of trees and other vegetation is maintained.

11.15.2.

No accumulation of slash shall be left within fifty (50) feet of the maximum high water line of a tributary stream. Slash shall either be removed or disposed of in such a manner that it lies on the ground and no part of it extends more than four (4) feet above the ground. Any debris that falls below the maximum high water line of a tributary stream shall be removed.

11.15.3.

Cleared openings legally in existence as of March 10, 2001 may be maintained, but shall not be enlarged, except as permitted by this Ordinance.

11.15.4.

Fields which have reverted to primarily shrubs, trees, or other woody vegetation shall be regulated under the provisions of this section.

11.16.

Home Occupations. All home occupations are subject to the provisions of Section 15.20 of the Shoreland Zoning Ordinance setting forth performance standards for home occupations regardless of whether they are located within the Shoreland Zone.

11.17.

Archeological and Historic Sites. All proposed land use activities shall be designed to protect archeological and historic sites that have been identified in the Town’s Comprehensive Plan, or by the Maine Historic Preservation Commission or the National Park Service. Any proposed land use activity involving structural development or soil disturbance on sites listed on the National Register of Historic Places shall be submitted by the applicant to the Maine Historic Preservation Commission for review and comment, at least twenty (20) business days prior to action being taken by the applicable Town permitting authority; provided, however, that the CEO may, in the event of an emergency as determined by the CEO, take appropriate action to allow only such limited land use activity as is necessary to protect the public health, safety and welfare in order to cure the emergency situation. The Town permitting authority shall consider comments received from the Commission prior to rendering a decision on the application.

11.18.

Workforce Housing

11.18.1.

Purpose

The 2005 Harpswell Comprehensive Plan sets forth the need in Harpswell for the availability of Workforce Housing to maintain the diversity of Harpswell's population. To that end, this Section is intended to provide and promote the acquisition and construction of housing that is affordable for current and future generations of Harpswell residents.

11.18.2.

Applicability

11.18.2.1.

Single Lot Development Standards

Notwithstanding any other provision of this Ordinance to the contrary, a Workforce Housing Unit may be built upon a lot, located outside of the shoreland zone and in lawful existence as of March 13, 2010 but that does not meet the Section 11.1 minimum lot size requirements, subject to an acceptable soils test and an engineering design for a one-unit residential subsurface wastewater disposal system approved by the CEO of the Town of Harpswell and the following requirements:

a.

Lot Size

A lot with a minimum area of twenty thousand (20,000) square feet may be used for a single Workforce Housing Unit.

b.

Road Setback

If there is a predominate pattern of development in the immediate neighborhood with respect to the relationship of the principal structure to the road as determined by the CEO, the Workforce Housing Unit must be located on the lot so that it has a similar relationship to the road as other neighboring principal structures on the same side of the road. If this requires the Workforce Housing Unit to be closer to the front lot line than the required front yard setback, the Workforce Housing Unit may encroach into the front setback area and no variance is required.

c.

Property Line Setback

If there is a predominate pattern of development in the immediate neighborhood with respect to the relationship of the principal structure to the property lines to the side of the structure as determined by the CEO, the Workforce Housing Unit must be located on the lot so that it has a similar relationship to the side property lines as other neighboring principal structures on the same side of the road. If this requires the Workforce Housing Unit to be closer to the property line(s) to the side of the structure than the required property line setback, the Workforce Housing Unit may encroach into the setback area(s) and no variance is required.

Prior to issuance of a building permit for a single Workforce Housing Unit, the Workforce Housing Lot shall be subjected to a Workforce Housing Covenant as set forth in Section 11.18.3.5 and that is recorded at the Cumberland County Registry of Deeds. The applicant shall provide a copy of the recorded instrument to the CEO.

11.18.2.2.

New Subdivisions

Applications for new subdivisions may provide permanently restricted Workforce Housing Lots or Units by means of one or more of the following, as determined by the Planning Board:

a)

Provide one (1) or more permanently restricted Workforce Housing Lots or Units within the project; or

b)

Provide one (1) or more off-site permanently restricted Workforce Housing Lots or Units.

11.18.2.3.

Notwithstanding any other provision of this ordinance to the contrary, two (2) or more Workforce Housing Lots or Units may share a subsurface wastewater disposal system, subject to review and approval of the CEO.

11.18.2.4.

An applicant who is qualified to purchase a Workforce Housing Lot or Unit under this Section at the time of purchase of such Lot or Unit shall not be required to vacate such Lot or Unit due to a subsequent increase in income, provided that said applicant otherwise remains in compliance with this Section and any rules and regulations adopted by the Board of Selectmen for its management.

11.18.3.

Standards for Development of Workforce Housing Subdivisions

11.18.3.1.

Density Bonus Provisions. If a subdivision application provides Workforce Housing Lots or Units, the subdivision shall be eligible for a density bonus of one (1) additional market rate lot or unit for each moderate income Workforce Housing Lot or Unit and two (2) additional market rate lots or units for each low or very low income Workforce Housing Lot or Unit. Non-bonus lots shall meet all requirements of this ordinance and the Subdivision Ordinance. The reduced minimum lot size of twenty thousand (20,000) square feet, as allowed in Section 11.18.2.1a, shall apply only to the creation of Workforce Housing Lots or bonus lots in a new subdivision. No density bonus shall be applied where offsite Workforce Housing Lots or Units are provided.

The following chart illustrates calculations under this subsection:

Proposed Units/Lots in subdivision# of Market Rate Units or Lots# of Moderate Income Workforce Housing Units/Lots# of Low/Very Low Income Workforce Housing Units/LotsBonus Market Rate Units/Lots AllowedTotal # of Units/Lots Possible
321014
540127
531138
651017
650128
10820212

For example, if developer/applicant proposes a three (3) lot subdivision and one (1) of those lots is affordable at the moderate income level, a bonus market rate lot would be allowed and then the total number of lots allowed would be four (4). If the developer/applicant proposes a five (5) lot subdivision and one (1) of those lots is affordable at the low income level, then the developer/applicant gains two (2) additional or “bonus” lots which may be market rate for a total of seven (7) lots. The same analysis and calculations apply to units.

11.18.3.2.

Plan Notations and Recorded Documentation of Affordability. A note shall be added to all subdivision plans designating the lots or units that shall be permanently restricted Workforce Housing Lots or Units. The Workforce Housing Covenant shall be recorded in the Cumberland County Registry of Deeds concurrently with the recording of the approved plan. A copy of the recorded instrument shall be provided to the CEO within thirty (30) days after recording. Any deed or conveyance of title to a Workforce Housing Lot or Unit shall include reference to the recorded Workforce Housing Covenant imposed upon the initial approval of such Unit or Lot and failure to do so shall constitute a violation of this ordinance.

11.18.3.3.

Location. Workforce Housing Lots and Units shall, to the greatest extent possible, be geographically dispersed throughout the subdivision or, if developed offsite, throughout the town.

11.18.3.4.

Neighborhood Compatibility. The appearance and design of Workforce Housing Units on Workforce Housing Lots shall be compatible with the appearance and design of dwellings in the remainder of the subdivision. Exterior designs of the outside facades of both the market rate units and Workforce Housing Units shall be submitted to the Planning Board during the subdivision review process.

11.18.3.5.

Workforce Housing Covenant. During the Planning Board review process and prior to final approval of a subdivision that includes Workforce Housing Lots or Units, the applicant shall submit to the Board of Selectmen, for approval on behalf of the Town, an executed Workforce Housing Covenant agreement that preserves the long-term affordability of the Workforce Housing Lots or Units to very low, low and moderate income households. The agreement must be in a form acceptable to the town and include, at a minimum, provisions for the following:

a)

Permanent affordability for low and moderate income buyers;

b)

A formula for accruing limited equity recapture to the owner of a Workforce Housing Lot or Unit which includes approved physical improvements;

c)

Enforcement provisions;

d)

Administrative costs to the Town; and

e)

Supervision of the agreement.

The Planning Board shall not grant final subdivision approval until the Board of Selectmen has approved the Workforce Housing Covenant agreement.

11.18.3.6.

Development of Workforce Housing Lots. For subdivisions for which the applicant chooses not to develop the Workforce Housing Unit or Workforce Housing Lot, the applicant may convey the Unit or Lot to a nonprofit corporation recognized under state and federal law as qualified to accept funding for the development of Workforce Housing. The nonprofit corporation shall complete the Unit or Lot pursuant to the provisions of this Section.

11.18.3.7.

Off Site Option. The Planning Board is authorized to allow acquisition and construction of Workforce Housing Lots or Units offsite. If the applicant chooses to utilize the offsite option for Workforce Housing Lots or Units, the applicant may join with others to provide the units through new off site construction or renovation of existing offsite structures.

Any deed or conveyance of title to an offsite Workforce Housing Lot or Unit shall include reference to the recorded Workforce Housing Covenant imposed upon the initial approval of such Lot or Unit and failure to do so shall constitute a violation of this ordinance.

11.18.3.8.

Administration of Workforce Housing. The Town may contract with a qualified individual or entity for the administration of Workforce Housing Lots or Units for the screening of qualifying potential purchasers and the long term monitoring and administration of this Section. The costs for administration of the Workforce Housing provisions of this ordinance shall be paid for out of the Workforce Housing Fund.

11.18.4.

Qualified Buyers. Preference for buyers of Workforce Housing Lots or Units shall be given to Town residents, persons employed in the Town, persons with family members or relatives in Town, and former Town residents who wish to re-establish Town residency.

11.19.

Swimming Pools. All swimming pools, as that term is defined in 22 M.R.S.A. § 1631(2), shall comply with the fence enclosure requirements set forth in 22 M.R.S.A. §§ 1631-1632, as may be amended from time to time. Failure to do so shall constitute a violation of this Ordinance.

11.20.

Wheelchair Ramps and Other Accessibility Structures

Notwithstanding any other setback provision of this Ordinance to the contrary, the CEO may issue a permit to allow a wheelchair ramp or other structure necessary for access to or egress from a structure within a required setback provided that the following standards are met:

(1)

The wheelchair ramp or other structure necessary for access to or egress (“accessibility structure”) from a structure is only for the purpose of making a structure accessible to a person with a disability who resides in or regularly uses the structure;

(2)

The accessibility structure is designed to limit the encroachment into the required setback to the greatest practical extent;

(3)

The design, construction and location of the accessibility structure is appropriate to the context of the existing structure and neighborhood; and

(4)

All of the requirements of this Ordinance, with the exception of setback requirements, are met.

All permits issued pursuant to this Section shall contain a condition of approval shown on the face of the permit as follows: “This permit approval is limited to the duration of the disability or the time that the individual requiring the accessibility structure resides in or regularly uses the structure. The encroachment into the setback shall be removed when the individual requiring the accessibility structure no longer resides in or regularly uses the structure. The permit shall be renewed within five (5) years from its issuance.”

For the purposes of this Section, the term “structure necessary for access to or egress from a structure” is defined to include railing, wall or roof systems necessary for the safety or effectiveness of the accessibility structure, and the term “disability” has the same meaning as a physical or mental disability under 5 M.R.S.A. § 4553-A, as may be amended from time to time.

Section 12Administration

§ 12

12.1.

Administrative Bodies and Agents

12.1.1.

Code Enforcement Officer (CEO). A CEO shall be appointed or reappointed annually by March 31.

12.1.2.

Powers and Duties. The CEO shall enforce the provisions of the Town's land use ordinances and monitor all activities within the jurisdiction of the Town's land use ordinances. The CEO shall follow up all building permits to ascertain compliance with any conditions or restrictions imposed on the permittee by the CEO, Planning Board, Board of Appeals, or the Town's land use ordinances. The CEO shall also investigate all complaints of alleged violations of the Town's land use ordinances. He or she shall enforce the Town's land use ordinances, as defined in his or her job description, for which purpose he or she shall establish reasonable procedures.

The CEO shall have all of the duties, responsibilities, and powers set forth in the State statute or local ordinance, including but not limited to the power to issue "stop work" orders, notices of violation of the Town's land use ordinances, and orders to cease violations. He or she shall also have the authority to revoke building permits as a result of violations of the Town's land use ordinances by the permit holder or his or her agents or contractors, noncompliance with conditions of building permits, or other sufficient cause under the Town's land use ordinances.

12.1.3.

The CEO shall keep a complete written record of all essential transactions of his or her office, including applications submitted, permits granted or denied, variances granted or denied, revocation actions, revocation of permits, appeals, court actions, violations investigated, violations found, and fees collected. Such records shall be available for inspection by the public.

On a biennial basis, a summary of this record for the shoreland districts shall be submitted to the Director of the Bureau of Land Quality Control within the Department of Environmental Protection.

12.1.4.

The CEO shall maintain a list of permits granted by his or her office, the Board of Appeals and the Planning Board. Permits will remain on the list as long as they are active.

12.1.5.

The CEO shall report to the Board of Selectmen any changes that may be needed in the Town's land use ordinances and prepare a file for review by the Selectmen and appropriate town boards and committees for future action.

12.2.

Planning Board. A Planning Board is created in accordance with the provisions of State law.

12.2.1.

Appointment.

12.2.1.1.

Appointment to the Board shall be made by the Selectmen as terms expire and/or as vacancies occur. Terms shall be for three (3) years.

12.2.1.2.

The Board shall consist of five (5) members and two (2) associate members.

12.2.1.3.

Associate members shall be appointed annually for one (1) year terms.

12.2.1.4.

Resignations from the Board shall be filled by appointments for the unexpired terms.

12.2.2.

Organization and Rules.

12.2.2.1.

The Board shall elect a chairman and a secretary from its members and create and fill such offices as it may determine. The term of all offices shall be one (1) year, with eligibility for re-election.

12.2.2.2.

When a member is unable to act because of conflict of interest, physical incapacity, absence, or any other reason satisfactory to the chairman, the chairman shall designate an associate member to sit in his stead.

12.2.2.3.

An associate member may attend all meetings of the Board and participate in its proceedings, but may vote only when he has been designated by the chairman to sit for a member.

12.2.2.4.

Any question as to whether a member shall be disqualified from voting shall be decided by a majority vote of the members except the member who is being challenged.

12.2.2.5.

The Chairman shall call at least eight (8) regular meetings of the Board each year.

12.2.2.6.

Four (4) persons shall be a quorum of the Board.

12.2.2.7.

The Board shall adopt rules for the transaction of business and the secretary shall keep a record of its resolutions, transactions, correspondence, findings, and determinations. All records shall be deemed public and may be inspected at reasonable times.

12.2.2.8.

The Selectmen may appoint a replacement for any member with two (2) or more consecutive unexcused absences from regularly scheduled meetings.

12.2.3.

Duties and Powers.

12.2.3.1.

The Board shall perform such duties and exercise such powers as are provided by Town Ordinances and State Law.

12.2.3.2.

Notification to Abutters. Owners of properties, any part of which is located within two hundred fifty (250) feet of the nearest boundary of any property on which a development requiring Planning Board approval is proposed shall be notified by the Municipal Office, at the applicant's expense, by first class mail, of the date on which the application will be considered by the Planning Board. Failure of any property owner to receive the notice sent as required under this subsection shall not necessitate another public meeting or invalidate any action taken by the Planning Board.

12.2.3.3.

Technical Review Fee. In addition to the application fee, every applicant to the Planning Board may also be required by the Planning Board to pay a technical review fee to defray the Town’s legal and technical costs of the application review. This fee must be paid to the Town and shall be deposited in an individual trust account, which is separate and distinct from all other Planning Board and Town accounts. When a technical review fee is required, the application will be considered incomplete until evidence of payment of this fee is submitted to the Planning Board. If the initial fee proves to be insufficient to meet the Town’s legal and technical costs of reviewing the application, the Planning Board may assess an additional fee(s) to cover such legal and technical costs.

The technical review fee may be used by the Planning Board only to pay reasonable costs incurred by the Board, at its discretion, which relate directly to the review of the application pursuant to the review criteria. Such services may include, but need not be limited to, consulting, engineering or other professional fees, attorney fees, recording fees, and appraisal fees. The Town shall provide the applicant, upon written request, with an accounting of his or her account and shall refund all of the remaining monies, including accrued interest, in the account after the payment by the Town of all costs and services related to the review. Such payment of remaining monies shall be made no later than sixty (60) days after the approval of the application, denial of the application, or approval with conditions of the application. Such refund shall be accompanied by a final accounting of expenditures from the fund. The monies in such fund shall not be used by the Board for any enforcement purposes.

12.3.

Board of Appeals. A Board of Appeals is created in accordance with the provisions of State law.

12.3.1.

Powers and Duties. The Board of Appeals has the following powers and duties:

12.3.1.1.

Administrative Appeals. To hear and decide appeals, on an appellate basis, where it is alleged that there is an error in any order, requirement, decision, or determination made by, or failure to act by, the Planning Board under the Basic Land Use Ordinance, Floodplain Management Ordinance, Shoreland Zoning Ordinance, Site Plan Review Ordinance, Subdivision Ordinance, or Wireless Telecommunications Facilities Ordinance, and to hear and decide administrative appeals, on a de novo basis, where it is alleged that there is an error in any order, requirement, decision or determination made by the Code Enforcement Officer in the administration of the Basic Land Use Ordinance, Floodplain Management Ordinance, Road Ordinance, Shoreland Zoning Ordinance, or Wireless Telecommunications Facilities Ordinance; provided, however, that decisions or determinations made by the CEO not to undertake an enforcement action shall not be appealable to the Board of Appeals. Other decisions made by the CEO or the Local Plumbing Inspector shall only be appealable to the Board of Appeals if expressly provided by statute, ordinance, or administrative regulation.

Citizen's Note: Some decisions made by the Planning Board in administering the Subdivision Ordinance are not subject to appeal. See Section 14 of the Subdivision Ordinance.

12.3.1.2.

Variance Requests. To authorize variances upon request or otherwise, on a de novo basis, within the limitations set forth in the Town's land use ordinances.

12.3.1.3.

Boundary Line Determinations. To hear and decide disputes, on a de novo basis, regarding the location of the boundary line for the Shoreland Zoning District.

12.3.1.4.

Notification to Abutters. Owners of properties, any part of which is located within two hundred fifty (250) feet of the nearest boundary of any property subject to an administrative appeal, variance request, or dispute about the Shoreland Zoning District boundary line shall be notified by the Municipal Office, at the applicant's expense, by first class mail, of the date on which the appeal, request, or dispute will be heard by the Board of Appeals. Failure of any property owner to receive the notice sent as required under this subsection shall not necessitate another public meeting or invalidate any action taken by the Board of Appeals.

12.4.

Definitions. For purposes of this Ordinance, certain terms or words used herein shall be defined as set forth in the Definitions Addendum attached hereto and made a part hereof.

Section 13Permits, Approvals and Certificates of Compliance Required

§ 13

13.1.

Permits or Approvals. After the effective date(s) of the applicable land use ordinance and amendments thereto, no person shall, without first obtaining a permit or approval, engage in any activity or use of land or structure requiring a permit or approval under the applicable Town land use ordinance governing the area in which the activity or land use would occur. Permits shall be posted on site in a manner that is readily visible within two (2) working days of issuance. Permits or approvals are required as noted in Table 1.

13.2.

Certificates of Compliance. Prior to occupancy or use of any structure or land use requiring a permit or approval, the owner shall obtain a certificate of compliance from the CEO. No occupancy or use of a structure, development, or land use may occur without a certificate of compliance, unless specifically allowed by the conditions of an approval or permit. The CEO shall not issue a certificate of compliance until he or she has determined that the structure, development or land use has been completed in accordance with all of the Town’s land use ordinances and with any conditions of permits or approvals imposed under those ordinances. A certificate of compliance shall not be issued for any project located in the Shoreland Zone until the owner has submitted pictures documenting the work done on the lot including all planting and revegetation required by the Shoreland Zoning Ordinance.

13.2.1.

Temporary Certificates of Compliance. Residing in a basement or foundation before the structure has been completed shall be permitted for a period of three (3) years from the date of issuance of a building permit subject to issuance of a one (1) year temporary certificate of compliance, renewable annually, provided the following conditions are met:

a.

reasonable progress, as determined by the CEO, is being made toward completion of the structure as permitted;

b.

nuisance conditions do not exist;

c.

a valid plumbing permit has been issued and all conditions of that permit are being met;

d.

dimensional requirements of the applicable ordinance are being met; and

e.

all other applicable requirements of the Town’s ordinances are being met.

13.3.

TABLE 1. LAND USES AND ACTIVITIES

Land UsesInteriorShoreland Districts
INTRPSRSBCFICFIIMFMB¹⁶
1. Non-intensive recreational uses not requiring structures such as hunting, fishing, and hikingYesYesYesYesYesYesYes¹⁵
2. Motorized vehicular traffic on existing roads and trailsYesYesYesYesYesYesYes
3. Forest management activities except for timber harvestingYesYesYesYesYesYesNo
4. *Timber Harvesting Note: DeletedYesNANANANANANA
5. *Clearing of vegetation for approved construction and other allowed usesYesCEOYesYesYesYesYes
6. Fire prevention activitiesYesYesYesYesYesYesYes
7. Wildlife management practicesYesYesYesYesYesYesYes
8. Soil and water conservation practicesYesYesYesYesYesYesYes
9. Mineral explorationYesNoNoNoNoNoNo
10. Mineral extraction including sand and gravel extractionPBNoNoNoNoNoNo
11. Surveying and resource analysisYesYesYesYesYesYesYes
Land UsesInteriorShoreland Districts
INTRPSRSBCFICF2MFMB¹⁶
12. Emergency operationsYesYesYesYesYesYesYes
13. *AgricultureYesPBYesYesNo¹YesNo
14. AquaculturePBPBPBPBPBPBPB¹⁶
15. Principal structures and uses
15.1 One and two–unit residential uses including drivewaysCEOPB¹⁰CEOCEONoCEONo
15.2 Multi-unit residentialPBNoNoNoNoNoNo
15.3 *CommercialPBNo¹³No¹³PBPB⁴PB²PB¹⁶
15.4 *IndustrialPBNoNoPBNoNoPB¹⁶
15.5 *Governmental and InstitutionalPBNo⁹PBNoNoNoPB
15.6 Small nonresidential facilities for marine, scientific or nature related purposesPBNoPBPBPBPBPB¹⁷
15.7 Nonagricultural Fertilizer Use
15.7.1 Chemical fertilizer, sludge, and non-composted manureNoNoNoNoNoNoNo
15.7.2 Organic fertilizer and composted manureYes²¹Yes²¹Yes²¹Yes²¹Yes²¹Yes²¹Yes²¹
15.8 Community Shoreland AccessPB²⁰CEOCEOCEOCEOCEOCEO
16. Accessory structures and usesCEO¹¹PB ¹¹CEO¹¹CEO¹¹CEO¹¹CEO¹¹CEO
17. Structural repairYesYesYesYesYesYesYes
17.1 Structural alteration/replacement: residentialCEOCEOCEOCEOCEOCEONo
17.2 Structural alteration/replacement: nonresidentialCEO/PBCEO/PBCEO/PBCEO/PBCEO/PBCEO/PBCEO/PB
18.1 *Noncommercial piers, docks, wharves, bridges and other structures and uses extending over or below the HAT, maximum high water line or wetlandYesPB¹⁴CEO 14/18CEO 14/18CEO 14/18CEO 14/18CEO 14/18
18.2 *Commercial piers, docks, wharves, bridges and other structures and uses extending over or below the HAT, maximum high water line or wetlandYesCEO/PB 14/19CEO/PB 14/19CEO/PB 14/19CEO/PB 14/19CEO/PB 14/19CEO/PB 14/19
18.3 Community piers, docks, and wharvesNAPBPBPBPBPBPB
19. Conversions of seasonal residences to year round residencesYesNoLPILPINoLPINo
20. *Home occupationsYes⁸PB⁸Yes⁸Yes⁸Yes⁸Yes⁸No
21. Sewage disposal systemsLPIPB¹⁰/LPILPILPILPILPILPI
22. *Essential servicesYesPBPBPBPBPBPB
23. Service drop for allowed usesYesYesYesYesYesYesYes
24. Public and private recreational areas involving minimal development, but no buildingYes¹²PBPBCEOCEOCEOCEO
25. *Individual private campsitesYesCEOCEOCEONoCEONo
26. *CampgroundsPBNo⁵PBPBNoPBNo
27. *Road constructionYes¹²No⁶CEOCEOCEO⁴CEOCEO
28. *Parking areas - residentialYesCEO/PBCEOCEOCEOCEONo
29. *Parking areas – nonresidentialPBNo⁹PBPBPB⁴PBPB
30. *MarinasPBNoNoPBPB⁷PB⁷PB¹⁶
31. Boat Repair FacilityPBNoNoPBPBPBPB¹⁶
32. Filling and earth moving < 50 cubic yardsYesCEOYesYesYesYesYes
33. Filling and earth moving > 50 cubic yards but less than 1,000 cubic yards¹²YesPBCEOCEOCEO⁴CEOCEO
34. Filling and earthmoving > 1,000 cubic yards ¹²PBPBPBPBPB⁴PBPB
35. *SignsCEOCEOCEOCEOCEOCEOCEO
36. Uses similar to allowed usesCEOCEOCEOCEOCEO⁴CEOCEO
37. Uses similar to uses requiring a CEO permitCEOCEOCEOCEOCEOCEOCEO
38. Uses similar to uses requiring a PB permitPBPBPBPBPB⁴PBPB
39. Projects which use more than 1000 gallons of water/dayCEOCEOCEOCEOCEOCEOPB
40. Land Management RoadsYesPBYesYesYesYesNo
41. Mobile Food HandlersBOSNoBOSBOSBOSBOSNo
Yes= Allowed (no permit required but the use must comply with all applicable land use standards)
No= Prohibited
BOS= License or other approval issued by the Board of Selectmen may be required under the Town’s Mobile Food Handlers Ordinance or Mitchell Field use policies; site plan review and approval by the Planning Board may be required if a seating area for customers is provided.
PB= Requires land use permit issued by the Planning Board
HAT= Highest Annual Tide
LPI= Plumbing permit required
CEO= Permit required from Code Enforcement Officer
MHW= Maximum High Water
NA= Not Applicable
INT= Areas not in the Shoreland Zone
RP= Resource Protection Zone
SR= Shoreland Residential
SB= Shoreland Business
CFI= Commercial Fisheries I
CFII= Commercial Fisheries II

Citizen's Note: If you are uncertain about the activity you wish to conduct, that is not listed above, you are advised to contact the Code Enforcement Office for further details.

FOOTNOTES: Land Use Table

* For further information on the * uses in land use chart, see Section 15 of the Shoreland Zoning Ordinance.

1.

No - except grandfathered properties.

2.

Marine related services only. Retail stores limited to nine hundred (900) or less square feet in size.

3.

No except limited Commercial Fishing activities.

4.

Functionally water-dependent and accessory to Commercial Fishing uses only.

5.

Except when area is zoned for resource protection due to flood plain criteria in which case a permit is required from the Planning Board.

6.

Except to provide access to permitted uses within the district, or where no reasonable alternative route or location is available outside the RP area, in which case a permit is required from the Planning Board.

7.

Primarily commercial fishing related use.

8.

Home occupations that provide public restrooms and showers or serve food to the public require a CEO permit. All home occupations are subject to the provisions of Section 15.20 of the Shoreland Zoning Ordinance regardless of whether they are located within the Shoreland Zone.

9.

Additions or expansions to existing Town Office Complex may be allowed with Planning Board approval

10.

Only as provided in Section 13.1.1 of the Shoreland Zoning Ordinance.

11.

When a structure is accessory to both residential and nonresidential uses, the provisions of the more restrictive ordinance shall apply.

12.

May require site plan review approval. See Town of Harpswell Site Plan Review.

13.

Except for other allowed commercial uses listed in the Table that are allowed in the respective district.

14.

Excluding bridges and other crossings not involving earthwork, in which case no permit is required.

15.

Hunting is prohibited on all property at Mitchell Field that is owned by the Town of Harpswell.

16.

At least forty-five percent (45%) of the gross leasable lot area within the district must be utilized for aquaculture, marinas, boat repair facilities, and/or functionally water-dependent uses as defined in the Definitions Addendum. Not more than fifteen percent (15%) of the gross leasable lot area in the district may be used for commercial or industrial uses that are not functionally water-dependent uses, aquaculture, marinas, and/or boat repair facilities nor other marine-related businesses as defined in the Definitions Addendum provided that these uses may not be located within two hundred fifty (250) feet of the HAT of the coastal wetland. Marine-related business uses are allowed within the district provided that the limitations set forth above are met. The use of the pier and the causeway leading to the pier is limited to activities involving public access and recreation and activities related to and in support of functionally water-dependent uses and marine related businesses that are located within the Mitchell Field Marine Business District provided that the private use of these facilities does not unduly restrict reasonable public access to and use of the pier.

17.

The limitation on the size of nonresidential facilities for marine, scientific, or nature related purposes shall not apply in the Mitchell Field Business Districts if the Planning Board finds that the scale and location of the facility are consistent with the objectives of shoreland zoning and the Mitchell Field Master Plan.

18.

Permit applications for noncommercial, private piers, docks or wharves with a maximum width of six (6) feet as measured parallel to the shoreline and which do not extend below the low water line shall be reviewed and issued by the CEO. Noncommercial, private piers greater than six (6) feet wide as measured parallel to the shoreline or which extend below the low water line are prohibited.

19.

Permit applications for commercial piers, docks or wharves with a maximum width of twelve (12) feet as measured parallel to the shoreline and which limit the length of the structure to the minimal amount necessary to provide access to the boats intended to use the facility shall be reviewed and issued by the CEO. Permits for commercial piers greater than twelve (12) feet wide as measured parallel to the shoreline or which exceed the minimum length necessary to provide access to the boats intended to use the facility shall be reviewed and issued by the Planning Board.

20.

Only as provided in Section 13.1.2. of the Shoreland Zoning Ordinance.

21.

Organic fertilizer and composted manure may not be applied within twenty-five (25) feet of the maximum high water line of a great pond, stream, tributary stream, HAT of the coastal wetland or the upland edge of a freshwater wetland as outlined in Section 15.21.1 of the Shoreland Zoning Ordinance.

Citizen's Note: Land use activity adjacent to protected natural resources requires a permit from the Department of Environmental Protection pursuant to the Natural Resources Protection Act, 38 M.R.S.A.§ 480-C, as may be amended from time to time. Please see CEO for more information.

13.3.

Permit and Approval Application

13.3.1.

Every applicant for a permit or approval shall submit a written application including a scaled site plan on a form provided by the CEO to the appropriate administering body or agent. Application forms shall account for all aspects to which the Town's land use ordinances apply. If the application is for a project that is located in the Shoreland Zone, the application shall include pictures of the lot documenting the existing conditions on the lot including the area adjacent to a coastal or freshwater wetland, stream, tributary stream or great pond.

13.3.2.

All applications shall be signed by the owner or owners of the property, certifying that the information in the application is complete and correct. If the person signing the application is not the owner of the property, then that person shall submit a letter of authorization from the owner.

13.3.3.

All applications shall be dated and the CEO shall note upon each application the date and time of its receipt.

13.3.4.

A completed application for a plumbing permit, including the site evaluation approved by the Plumbing Inspector, shall be submitted whenever the nature of a proposed structure would require the installation of a subsurface sewage disposal system. Whenever the nature of the proposed use includes any construction, installation, or alteration of plumbing facilities, the applicant shall provide one or more of the following, as appropriate, documenting that the structure or use will be served by an adequate wastewater disposal system:

-

A valid plumbing permit or completed application for a plumbing permit, including the site evaluation approved by the plumbing inspector.

-

A certificate of approval indicating the existing system was installed after July 1974 and was inspected and approved by the plumbing inspector.

-

Documentation from the DEP showing that a licensed overboard discharge system exists in accordance with 38 M.R.S.A. § 413 and § 414, as may be amended from time to time.

-

Written documentation, acceptable to the plumbing inspector that an adequate wastewater disposal system exists for the property.

The plumbing inspector may require that systems installed prior to 1974 be inspected and documented if the applicant cannot provide evidence that an adequate system exists. In lieu of this inspection, a replacement system may be designed for future installation.

13.4.

Procedure for Administering Permits

13.4.1.

With the exception of applications for subdivision and site plan review approvals and applications for which the Planning Board is provided the opportunity to take jurisdiction, the Planning Board or CEO, as appropriate, shall examine all written applications for permits or other actions under the Town's land use ordinances and within thirty-five (35) days from the date of receipt of such written application, shall notify the applicant in writing either that the application is a complete application, or, if the application is incomplete, that specified additional material is needed to make the application complete.

13.4.2.

With the exception of applications for subdivision and site plan review approvals and applications for which the Planning Board is provided the opportunity to take jurisdiction, the Planning Board may or CEO shall, as appropriate, within the thirty-five (35) day time frame, visit the site for which the permit is sought.

13.4.3.

The applicant shall have the burden of proving that the proposed land use activity is in conformity with the purpose and provisions of the Town's land use ordinances and any State or Federal law, regulation or rule.

13.4.4.

With the exception of applications for subdivision and site plan review approvals and applications for which the Planning Board is provided the opportunity to take jurisdiction, the Planning Board or CEO, as appropriate, shall approve, approve with conditions, or deny all permit applications in writing within thirty-five (35) days of receiving a completed application. However, if the Planning Board has a waiting list of applications, a decision on the application shall occur within thirty-five (35) days of the public hearing if one is held, or within thirty-five (35) days of the next regularly scheduled meeting at which the application is considered.

Citizen’s Note: See Section 13.4.7 if Planning Board approval is required for activity in the Shoreland Zone.

13.4.5.

Permits shall be approved and approvals given when the proposed use or structure is found to be in conformance with the purposes and provisions of the applicable ordinance.

13.4.6.

No permit or approval shall be granted for an application involving a structure if the structure would be located in an unapproved subdivision or would violate any other local ordinance or regulation or any State law, or Federal law or regulation or rule, which the Town is responsible for enforcing.

13.4.7.

The Planning Board shall approve, or approve with conditions, a request for a land use permit in the Shoreland Zone if the Board finds that the proposed use:

13.4.7.1.

Will maintain safe and healthful conditions;

13.4.7.2.

Will not result in water pollution, erosion, or sedimentation to surface waters;

13.4.7.3.

Will adequately provide for the disposal of all wastewater;

13.4.7.4.

Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife habitat;

13.4.7.5.

Will conserve shore cover and points of access to inland and coastal waters;

13.4.7.6.

Will protect archaeological and historic resources as identified in the Town’s Comprehensive Plan, or by the Maine Historic Preservation Commission or the National Park Service;

13.4.7.7.

Will not adversely affect existing commercial fishing or maritime activities in a Commercial Fisheries I or II District;

13.4.7.8.

Will avoid problems associated with flood plains development and use; and

13.4.7.9.

Is in conformance with the provisions of Section 15, Land Use Standards of the Shoreland Zoning Ordinance.

If a permit or approval is either denied or approved with conditions, the reasons as well as conditions shall be stated in writing. No approval shall be granted for an application involving a structure if the structure would be located in an unapproved subdivision or would violate any other local ordinance or regulation or any State or federal law or regulation or rule which the municipality is responsible for enforcing.

13.5.

Fee and Time Limits

13.5.1.

Unless otherwise provided by law, permits and approvals shall expire if substantial start of construction or other permitted or approved activity has not commenced within twelve (12) months from the date on which the permit or approval was granted. An extension of time to commence shall be granted upon application to and approval by the CEO, if reasonable need can be shown. A permit or approval is transferable unless otherwise specified.

13.5.2.

Unless otherwise provided by local law, when a substantial start of construction, as defined in the Definitions Addendum, has been made in accordance with 13.5.1 and the Certificate of Compliance has not been issued by the Code Enforcement Office within five (5) years from the date on which the permit or approval was granted, the permit or approval shall expire. An extension of time to obtain a Certificate of Compliance may be granted upon applications to and approval by Board of Appeals, if reasonable need can be shown due to exigent circumstances. Exigent circumstances would include severe family, medical, or financial problems which prevented substantial completion of construction within the required five (5) year timeframe, as determined by the Board of Appeals.

13.5.3.

A nonrefundable fee, in such amount as may be established by the Board of Selectmen from time to time, shall be charged for applications, permits and approvals required under the Town’s land use ordinances, and a higher fee shall be charged for permit and approval applications that are filed by the applicant after the commencement of the activity for which the permit or approval is required.

13.5.4.

When a permit or approval has expired, a new permit or approval must be obtained in order for construction to continue. Further construction must meet the requirements of the Town’s land use ordinances in effect at the time the new permit or approval is sought.

13.5.5.

The provisions of Sections 13.5.2 and 13.5.4. of this Ordinance apply only to permits and approvals issued on or after April 1, 1998

13.5.6.

Failure of the Planning Board to act upon a request for action or upon an application for a permit or approval, or of the CEO to act upon a request for action or upon an application for a building permit, within thirty-five (35) days of the date of receipt of a complete application shall constitute denial of that request or application, unless the applicable ordinance provides otherwise.

13.6.

Violation, Enforcement, Penalties, and Legal Actions

13.6.1.

Any violation of the Town's land use ordinances shall be deemed to be a nuisance.

13.6.2.

If the CEO finds that provisions of the Town's land use ordinances are being violated, he or she shall notify personally or in writing, if necessary by certified mail return receipt requested, the person responsible for such violation indicating the nature of the violation, and ordering the action necessary to correct it. He or she shall order the discontinuance of illegal use of land, structures, or work being done, removal of illegal structures, or of additions, alterations, or structural changes thereto; discontinuance of any illegal work being done or nuisance conditions; or shall take any other action authorized by this Article to ensure compliance with or to prevent violation of the provisions of the Town's land use ordinances. A copy of such notice shall be submitted to the Board of Selectmen and shall be maintained as a permanent record.

13.6.3.

Any person, including but not limited to a landowner, a landowner's agent, or contractor who orders or conducts any activity in violation of the Town's land use ordinances shall be penalized in accordance with 30-A, M.R.S.A. § 4452, as may be amended from time to time.

Citizen's Note: Current penalties include fines of not less than one hundred ($100) dollars nor more than twenty-five hundred ($2,500) dollars. Fines may be assessed for each day the violation occurs.

13.6.3.1.

In addition to penalties provided herein, the Town may bring an action in the Superior Court or District Court to enjoin violators of the Town's land use ordinances, for collection of penalties, and for such other relief as may be provided by law.

13.6.3.2.

Each day in which a violation is proved to exist shall constitute a separate offense under this Section.

13.6.3.3.

In addition to the penalties provided above, any violation of Section 15.15.2. of the Shoreland Zoning Ordinance regarding clearing of vegetation within the seventy-five (75) foot shoreland setback must be remedied by replanting such that the standards of Section 15.15.2.2. of the Shoreland Zoning Ordinance for a well distributed stand of trees and other vegetation are met, unless the Selectmen find that the violation is minor, in which case they may determine such lesser penalty as law allows.

13.6.4.

When notification and penalties for actions in violation of the Town's land use ordinances do not result in the correction or abatement of the violation or nuisance condition, the CEO shall advise the Board of Selectmen, who may institute any and all actions and proceedings either legal or equitable, to correct the violation, including seeking injunctions of violations, that may be appropriate or necessary for the enforcement of the provisions of the Town's land use ordinances in the name of the Town. The Board of Selectmen is authorized to enter into administrative consent agreements for the purpose of eliminating violations of the Town's land use ordinances and recovering fines without Court action. Such agreements shall not allow an illegal structure or use to continue unless there is clear and convincing evidence that the illegal structure or use was constructed or conducted as a direct result of erroneous advice given by an authorized Town official and there is no evidence that the owner acted in bad faith, or unless the removal of the structure or use will result in a threat or hazard to public health and safety or will result in substantial environmental damage.

Section 14Variances and Appeals

§ 14

14.1.

Variances.

Variances may be permitted only under the following conditions:

14.1.1.

Variances may be granted only from dimensional requirements including but not limited to, lot width, structure height, and setback requirements.

14.1.2.

Variances shall not be granted for establishment of any uses otherwise prohibited by the applicable ordinance.

14.1.3.

A copy of each variance request, including the application and all supporting information supplied by the applicant, shall be forwarded by the Board of Appeals or its designee to the Commissioner of the Department of Environmental Protection at least twenty (20) days prior to action by the Board of Appeals. Any comments received from the Commissioner prior to the action by the Board of Appeals shall be made part of the record and shall be taken into consideration by the Board of Appeals

14.1.4.

The Board shall not grant a variance unless it finds that:

14.1.4.1.

The proposed structure or use would meet the requirements of the applicable Town land use ordinance except for the specific provision(s) which has created the nonconformity and from which relief is sought; and

14.1.4.2.

Except as provided in subsections 14.1.4.3 and 14.1.4.4, and 14.1.4.5, the Board may grant a variance only if strict application of the ordinance to the applicant and the applicant’s property would cause undue hardship. The term “undue hardship” as used in this subsection means:

1.

That the land in question cannot yield a reasonable return unless a variance is granted;

2.

That the need for a variance is due to the unique circumstances of the property and not to the general conditions in the neighborhood;

3.

That the granting of a variance will not alter the essential character of the locality; and

4.

That the hardship is not the result of action taken by the applicant or a prior owner.

14.1.4.3.

Disability Variance. The Board may grant a variance to an owner of a dwelling for the purpose of making that dwelling accessible to a person with a disability who resides in or regularly uses the dwelling. The Board shall restrict any variance granted under this subsection solely to the installation of equipment or the construction of structures necessary for access to or egress from the dwelling by the person with the disability. The Board may impose conditions on the variance, including limiting the variance to the duration of the disability or to the time that the person with the disability lives in the dwelling. For the purposes of this subsection, a disability has the same meaning as a physical or mental disability under 5 M.R.S.A., § 4553, as may be amended from time to time, and the term “structures necessary for access to or egress from the dwelling” is defined to include railing, wall, or roof systems necessary for the safety or effectiveness of the structure.

14.1.4.4.

Setback Variance for One-Unit Residential Uses. The Board may grant a setback variance for a one-unit residential use. The Board may consider a variance from a setback requirement only when strict application of the zoning ordinance to the applicant and the applicant's property would cause undue hardship. The term "undue hardship" in the subsection means:

1.

The need for a variance is due to the unique circumstances of the property and not to the general conditions in the neighborhood;

2.

The granting of a variance will not alter the essential character of the locality;

3.

The hardship is not the result of action taken by the applicant or a prior owner;

4.

The granting of the variance will not substantially reduce or impair the use of an abutting property; and:

5.

That the granting of a variance is based upon demonstrated need, not convenience, and no other feasible alternative is available.

A variance granted under this subsection is strictly limited to permitting a variance from a setback requirement for a one-unit residential use that is the primary year-round residence of the applicant. A variance under this subsection may not exceed twenty percent (20%) of a setback requirement and may not be granted if the variance would cause the area of the dwelling to exceed the maximum permissible lot coverage. The Board may allow for a variance under this subsection to exceed twenty percent (20%) of the setback requirement, except for minimum setbacks from a water body, or the upland edge of a wetland, or a tributary stream within the Shoreland Zone, if the applicant has obtained the written consent of an affected abutting land owner.

14.1.4.5.

Practical Difficulty Variance. The Board may grant a variance from the dimensional standards of a zoning ordinance when strict application of the ordinance to the applicant and the applicant's property would cause a practical difficulty and when the following conditions exist:

1.

The need for a variance is due to the unique circumstances of the property and not to the general condition of the neighborhood;

2.

The granting of the variance will not produce an undesirable change in the character of the neighborhood and will not unreasonably detrimentally affect the use or market value of abutting properties;

3.

The practical difficulty is not the result of action taken by the petitioner or a prior owner;

4.

No other feasible alternative to a variance is available to the petitioner;

5.

The granting of a variance will not unreasonably or adversely affect the natural environment; and

6.

The property is not located in whole or in part within the Shoreland Zone.

As used in this subsection, "dimensional standards" means and is limited to ordinance provisions relating to lot area, lot coverage, frontage, and setback requirements.

As used in this subsection, "practical difficulty" means that the strict application of the ordinance to the property precludes the ability of the applicant to pursue a use permitted in the zoning district or area in which the property is located and results in significant economic injury to the applicant.

14.1.5.

Variance Recorded. If the Board of Appeals grants a variance under this section, a certificate indicating the name of the current property owner, identifying the property by reference to the last recorded deed in its chain of title and indicating the fact that a variance, including any conditions on the variance, has been granted and the date of the granting, shall be prepared in recordable form. This certificate must be recorded in the local Registry of Deeds within ninety (90) days of the final written approval of the variance or the variance is void. The variance is not valid until recorded as provided in this subsection. For the purpose of this subsection, the date of the final written approval shall be the date stated on the written approval.

14.1.6.

Interpretation of Ordinance Requirements. The Board of Appeals shall limit any variances granted as strictly as possible in order to insure conformance with the purposes and provisions of this Ordinance to the greatest extent possible, and in doing so, may impose such conditions to a variance as it deems necessary. The party receiving the variance shall comply with any conditions imposed.

14.1.7.

A copy of all variances granted by the Board of Appeals in the Shoreland Zone shall be submitted to the Department of Environmental Protection within fourteen (14) days of the decision.

14.2.

Appeals

14.2.1.

Administrative Appeal. An administrative appeal may be taken to the Board of Appeals by an aggrieved party from a decision of the CEO, the Planning Board, or the LPI outlined in Section 12.3.1. Such appeal shall be taken within forty (40) days of the date of the decision appealed from, and not otherwise, except that the Board, upon showing of good cause, may waive the forty (40) day requirement.

14.2.2.

Such appeal shall be made by filing with the Board of Appeals a written notice of appeal which includes:

1.

A concise written statement indicating the decision of the Planning Board, CEO or Local Plumbing Inspector being appealed from, the specific provisions of the applicable ordinance, to which the decision is alleged to be in error, and what relief is requested.

2.

A sketch drawn to scale showing lot lines, location of existing structures and other physical features of the lot pertinent to the relief sought.

14.2.3.

Upon being notified of an administrative appeal, the CEO, Local Plumbing Inspector or Planning Board, as appropriate, shall transmit to the Board of Appeals all the papers constituting the record of the decision appealed from.

14.2.4.

The Board of Appeals shall hold a public hearing on the appeal within thirty-five (35) days of its receipt of an appeal request.

14.3.

Decision by Board of Appeals

14.3.1.

A majority of the Board shall constitute a quorum for the purpose of deciding an appeal, request, or dispute. A member who abstains shall not be counted in determining whether a quorum exists.

14.3.2.

The concurring vote of a majority of the members of the Board of Appeals present and voting shall be necessary to reverse an order, requirement, decision, or determination of the CEO, Local Plumbing Inspector or Planning Board, or to decide in favor of the applicant on any matter on which it is required to decide, or to grant any variance, or to settle a dispute about the Shoreland Zoning District boundary. When acting in an appellate capacity, the Board of Appeals may reverse the decision of the Planning Board only when there is an error in the Planning Board’s interpretation or application of specific provisions of the ordinance. When acting in a de novo capacity, the Board of Appeals shall hear and decide the matter afresh, undertaking its own independent analysis of the evidence.

14.3.3.

The person filing the variance application, administrative appeal or dispute about the Shoreland Zoning District boundary line shall have the burden of proof.

14.3.4.

The Board shall decide all appeals, requests, or disputes within thirty-five (35) days after the close of the hearing, and shall issue a written decision on all appeals.

14.3.5.

All decisions shall become a part of the record and shall include a statement of findings and conclusions as well as the reasons or basis thereof, and the appropriate order, relief or denial thereof.

14.4.

Appeal to Superior Court

Any aggrieved party who participated in the proceedings before the Board of Appeals may take an appeal to Superior Court as set forth in 30-A M.R.S.A. § 2691(3), as may be amended from time to time.

14.5.

Reconsideration

The Board of Appeals may reconsider any decision as set forth in 30-A M.R.S.A. § 2691(3), as may be amended from time to time. The Board may conduct additional hearings and receive additional evidence and testimony.

AddendumDefinitions

Addendum

Citizen's Note: The Definitions Addendum provides a common set of definitions for the Basic Land Use Ordinance, the Shoreland Zoning Ordinance, the Site Plan Review Ordinance and the Subdivision Ordinance.

All words not defined herein shall carry their customary and usual meanings. Words used in the present tense shall include the future. Words used in the singular shall include the plural and vice versa. The word "lot" shall include "parcel" and "plot." The words "shall" or "must" are used to indicate the mandatory and the word "may" is used to indicate the permissive. The words "occupied" or "used" shall be considered as though followed by the words "or intended, arranged, or designed to be used or occupied."

Abutters – the owners of property listed on the Town’s most recent assessing records who may be entitled to receive notice of applications before the Planning Board or the Board of Appeals.

Abutting Property – any lot which is physically contiguous with the parcel of land, even if only at a point and any lot which is located directly across a public or private way from the parcel of land such that the extension of the side lot lines of the parcel would touch or enclose the abutting property.

Accessory Dwelling Unit (ADU) – A self-contained dwelling unit located within or attached to a one-unit residential structure, or within an accessory or freestanding structure on the same lot as a principal one-unit residential structure for use as complete, independent living quarters, with provision for living, sleeping, bathing, and cooking that complies with the standards of Section 11.12 of the Basic Land Use Ordinance. The accessory dwelling unit shall be secondary, incidental and subordinate to the principal one-unit residential use.

Accessory Structure or use – a use or structure which is incidental and subordinate to the principal use or structure. Accessory uses, when aggregated shall not subordinate the principal use of the lot. A deck or similar extension of the principal structure or a garage attached to the principal structure by a roof or a common wall is considered part of the principal structure.

Active Building Permit – a building permit that has not expired or been revoked

Aggrieved Party – an owner of land whose property is directly or indirectly affected by the granting or denial of a permit or variance under this ordinance; a person whose land abuts land for which a permit or variance is under consideration or has been granted; or any other person or group of persons who have suffered particularized injury as a result of the granting or denial of such permit or variance.

Agriculture – the production, keeping or maintenance for sale or lease, of plants and/or animals, including but not limited to: forage and sod crops; grains and seed crops; dairy animals and dairy products; poultry and poultry products; livestock; fruits and vegetables; and ornamental and green house products. Agriculture does not include forest management and timber harvesting activities.

Applicant – the assessed owner or owners of land for which a permit, variance or appeal is sought or person with documented title, right, or interest in the land for which a permit, variance or appeal is sought.

Aquaculture – the growing or propagation of harvestable fresh water, estuarine, or marine plant or animal species.

Basal Area – the area of a cross section of a tree stem at four and one half (4½) feet above ground level and inclusive of bark.

Basement – any portion of a structure with a floor-to-ceiling height of six (6) feet or more and having more than fifty percent (50%) of its volume below the existing ground level.

Bed and Breakfast Home Occupations – bed and breakfast means any establishment where the general public can stay overnight for a fee in the home occupied by the owner and are provided with a breakfast meal but shall not serve other meals or have dining facilities open to the public. For the purpose of this ordinance, Bed and Breakfast establishments shall be considered as home occupations if they provide no more than four (4) bedrooms for overnight guests. Such usage as a Bed and Breakfast is subject to adequate sewage disposal as certified by the plumbing inspector.

Boat Launching Facility – a facility designed primarily for the launching and landing of watercraft, and which may include an access ramp, docking area, and parking spaces for vehicles and trailers.

Boat Repair and Construction Facility – a facility whose primary or sole use is the construction or repair of commercial and/or pleasure vessels and which may also supply three (3) or less moorings as an accessory use.

Brunswick Labor Market Area – the median family income most recently published by the Maine State Housing Authority for the Brunswick region.

Buffer, Buffer Area, Buffer Strip – land area used to visibly separate and screen one (1) use from another or to shield or block noise, light, or other nuisances, and thus, minimize the effects to adjacent properties or sensitive natural resources. A buffer may include one (1) or a combination of the following: plantings of sufficient mass to effectively block the view or that shall block the view after thirty-six (36) months, walls, fences, or natural growth.

Bureau of Forestry – the State of Maine Department of Agriculture, Conservation, and Forestry’s Bureau of Forestry.

Campground – any area or tract of land to accommodate two (2) or more parties in temporary living quarters, including, but not limited to tents, recreational vehicles or other shelters.

Campsite – any plot of ground within a campground intended for use by a tent, trailer, recreation vehicle or similar shelter under the control of an individual camper.

Canopy – the more or less continuous cover formed by tree crowns in a wooded area.

Change from one category of non-residential use to another category of non-residential use – a change in the type of occupancy of a non-residential structure, or a portion thereof, such that the basic type of use is changed, such as from retail to office or storage to a restaurant, but not including a change in the occupants.

Chemical Fertilizer – a chemical fertilizer is defined as any inorganic material of wholly or partially synthetic origin that is added to the soil to sustain plant growth.

Code Enforcement Officer – the person appointed as Code Enforcement Officer or Alternate Code Enforcement Officer by the Board of Selectmen.

Commercial Use – the use of lands, buildings, or structures, other than a "home occupation", defined below, the intent and result of which activity is the production of income from the buying and selling of goods and/or services, exclusive of rental of residential buildings and/or dwelling units, and may also include the processing of marine life and the sale thereof in any form.

Community Dock – a single wharf, pier, dock and/or float located: on a lot in a subdivision approved by the Planning Board and having a common right of use by the association of homeowners having common rights of interest in the lot and which is used by the property owners for loading and unloading of passengers and/or cargo and the tying of dinghies; or on town owned land having the common right of use by the general public.

Community Shoreland Access – a point of access to the coastal wetland including associated structures such as raised boardwalks, stairs, access roads, paths and parking lots located: on a lot in a subdivision approved by the Planning Board and having a common right of use by the association of homeowners having common rights of interest in the lot containing the point of access; or on town owned land having the common right of use by the general public.

Composted Manure – a mixture of decaying organic matter, as from animal bedding or leaves and excrement, typically barnyard or stable dung, used as a soil amendment to improve soil structure and provide nutrients. Composted manure must be, at a minimum, aged for a period of not less than ninety (90) days to allow high levels of nitrogen to leach from the material before application.

Comprehensive Plan – the “2005 Update of the Harpswell Comprehensive Plan” adopted March 2005, and any amendments to the plan that have been subsequently adopted by the voters of the Town. Map No. 5 of the 1987 Comprehensive Plan is also included.

Contiguous Property; Contiguous Lots – lots that adjoin at any line or point

Curb Cut – any new vehicular entrance (driveway) on to an established road

Cut-Off Fixture – a lighting fixture or luminaire that controls glare by directing light well below the horizontal. A cut-off fixture must limit the direction of light so that a maximum of two and one half percent (2.5%) of the total lamp lumens shine above ninety (90) degrees or a line parallel to the surface of the ground and a maximum of ten percent (10%) of the lamp limens shine above eighty (80) degrees.

Development – a change in land use involving alteration of the land, water or vegetation, or the addition or alteration of structures or other construction not naturally occurring.

Dimensional Requirements – numerical standards relating to spatial relationships including but not limited to setback, lot area, road frontage, shore frontage and height.

Disability – any disability, infirmity, malformation, disfigurement, congenital defect or mental condition caused by bodily injury, accident, disease, birth defect, environmental conditions or illness; and also includes the physical or mental condition of a person which constitutes a substantial handicap as determined by a physician or in the case of mental handicap, by a psychiatrist or psychologist, as well as any other health or sensory impairment which requires special education, vocational rehabilitation or related services.

Drinking Water Standards – the standards for primary and secondary drinking water as set forth in Title 22, M.R.S. Chapter 601, Subchapter 11 and as further defined in the State of Maine Rules Relating to Drinking Water, Chapter 7.

Driveway – a private vehicular access way connecting a house, garage or other structure on a single lot to a road.

Dwelling – a residential structure containing one (1) or more dwelling units, including single-unit, two (2) unit, and multi-unit residential uses, and manufactured housing but not recreational vehicles.

Dwelling Unit – a room or group of rooms designed and equipped for use as a separate living space by a household containing cooking, sleeping and toilet facilities with free and open circulation between these areas by members of the household. A dwelling unit is intended for occupancy by one (1) household living independently in which the members of the household share the use of common areas and have regular interaction in the course of their day-to-day activities. The term shall include mobile homes, and rental units that contain cooking, sleeping, and toilet facilities regardless of the time-period rented but not recreational vehicles.

Emergency Operations – operations conducted for the public health, safety or general welfare, such as protection of resources from immediate destruction or loss, law enforcement, and operations to rescue human beings, property and livestock from the threat of destruction or injury.

Equity Recapture – a resale formula included in a Workforce Housing Covenant that controls the sale price of a Workforce Housing Lot or Workforce Housing Unit. The purpose of a resale formula is to maintain long-term affordability, discourage speculation, assure the continued availability of workforce housing, and ensure moderate long term equity gain to the owner of any Workforce Housing Lot and Unit approved under the Workforce Housing provisions of the Basic Land Use Ordinance, as may be amended from time to time.

Essential Services – the construction, alteration or maintenance of gas, electrical or communication facilities; steam, fuel, electric power or water transmission or distribution lines, towers and related equipment; telephone cable or lines, poles and related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines, collection or supply systems; and associated storage tanks. Such systems may include towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals, hydrants and similar accessories, but shall not include service drops or buildings which are necessary for the furnishing of such services.

Expansion of a Structure – an increase in the footprint, floor area, height, impermeable area or volume of a structure, including all extensions such as, but not limited to, attached decks, garages, porches and greenhouses.

Expansion of Use – the addition of weeks or months to a use's operating season; additional hours or operation; or the use of more of the footprint of the structure or ground area devoted to a particular use.

Fisheries, Significant Fisheries – areas identified by a government agency such as the Maine Department of Inland Fisheries and Wildlife (IFW) or Maine Department of Marine Resources (DMR) as having significant value as fisheries and any areas so identified in the Town’s comprehensive plan.

Flexible Lot Size Subdivision – a subdivision approved in accordance with Section 9.4.3 of the Subdivision Ordinance in which the lots may be less than eighty thousand (80,000) square feet and at least fifty percent (50%) of the parcel is set aside as protected or common open space.

Floodway – the channel of a river or other watercourse and adjacent land areas that must be reserved in order to discharge the one hundred (100) - year flood without cumulatively increasing the water surface elevation by more than one (1) foot in height.

Floor Area – the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls, plus the horizontal area of any unenclosed portions of a structure such as porches and decks.

Food Products – a raw, cooked or processed edible substance, ice, non-alcoholic beverage, or ingredient used or intended for use or for sale in whole or in part for human consumption.

Footprint – the entire area of ground covered by the structure(s) on a lot, including but not limited to cantilevered or similar overhanging extensions, as well as unenclosed structures, such as patios and decks.

Foundation – the supporting substructure of a building or other structure including but not limited to basements, slabs, sills, posts, frost walls or other base consisting of concrete, block, brick or similar material.

Frontage -

Road Frontage – the linear distance between the sidelines of a lot, measured along the lot line that borders upon whatever road serves as legal access to the lot. For the purposes of these ordinances, the following ways may be used to measure road frontage provided that they are no less than thirty-three (33) feet in width throughout their length:

1.

A deeded private right of way.

2.

An existing town way, public easement or State or State Aid Highway, provided access is not specifically prohibited.

3.

An existing deeded right of way, whether dedicated to public use or not, on a road shown on an approved subdivision plan.

4.

An existing private road for which no deed can be located but where the applicant can establish at least twenty (20) years of uncontested usage, and can establish the physical characteristics of the road, including but not limited to, its width.

5.

A public or private right of way that provides passage to pedestrians and vehicles and which is the legal access to a lot.

Shore Frontage – the length of a lot bordering on a water body or wetland measured in a straight line between the intersections of the lot lines with the shoreline.

Functionally Water-Dependent Uses – those uses that require, for their primary purpose, location on submerged lands or that require direct access to, or location in, coastal and inland waters and which cannot be located away from these waters. The uses may include, but are not limited to commercial and recreational fishing and boating facilities, fin fish and shellfish processing, fish-related storage and retail and wholesale fish marketing facilities, waterfront dock and port facilities, shipyards and boat building facilities, marinas, navigation aids, basins and channels, shoreline structures necessary for erosion control purposes, industrial uses dependent upon water-borne transportation, and uses which primarily provide general public access to marine or tidal waters. Recreational boat storage buildings are not considered to be a functionally water-dependent use.

Citizen's Note: Boathouses and boat building may not qualify as functionally water-dependent uses.

Glare – excessive brightness that makes it difficult to see or that causes discomfort including the following:

•

Direct Glare or glare from insufficiently shielded light sources or areas of excessive luminance within the field of view,

•

Disability Glare or the effect of stray light in the eye whereby visibility and visual performance are reduced, and

•

Discomfort Glare or glare that produces discomfort even if it does not interfere with visual performance or visibility.

Great Pond – any inland body of water which in a natural state has a surface area in excess of ten (10) acres, and any inland body of water artificially formed or increased which has a surface area in excess of thirty (30) acres.

Green Infrastructure – an approach to water management that protects, restores, or mimics the natural water cycle. Examples are rain gardens, permeable pavements, green roofs, infiltration planters, trees and tree boxes, rainwater harvesting systems (rain barrels), bioswales as well as preservation and restoration of natural landscapes (such as forests, floodplains and wetlands).

Gross Income – the income from all sources of all household members who reside in a Workforce Housing Lot or Unit.

Gross Leasable Lot Area – for the purpose of the Mitchell Field Marine Business District only, the gross leasable lot area is the total of the area of the Mitchell Field Marine Business District excluding any road rights-of-way, utility easements, easements for public access, or land that will not be available for lease for development including the pier and the causeway leading to the pier.

Ground Cover – small plants, fallen leaves, needles, and twigs, and the partially decayed organic matter on the forest floor.

Ground Water – all waters found beneath the surface of the earth.

Hazard tree - a tree with a structural defect, combination of defects, or disease resulting in a structural defect that under the normal range of environmental conditions at the site exhibits a high probability of failure and loss of a major structural component of the tree in a manner that will strike a target. A normal range of environmental conditions does not include meteorological anomalies, such as, but not limited to: hurricanes; hurricane-force winds; tornados; microbursts; or significant ice storm events. Hazard trees also include those trees that pose a serious and imminent risk to bank stability. A target is the area where personal injury or property damage could occur if the tree or a portion of the tree fails. Targets include roads, driveways, parking areas, structures, campsites, and any other developed area where people frequently gather and linger.

Hazardous Waste – any material(s) included within the definition of hazardous waste contained in Chapter 850 of the Maine Department of Environmental Protection (DEP) Rules adopted pursuant to 38 MRSA Section 1319-O (1), as such rules may be amended from time to time.

Height – the vertical distance as measured from the mean original (prior to construction) grade at the downhill side of the structure to the highest point of the structure, excluding chimneys, steeples, antennas and similar appurtenances which have no floor area.

Highest Astronomical Tide – The elevation of the highest predicted astronomical tide, referenced to Mean Lower Low Water (MLLW) at the Portland, Maine tidal station and based on the most recent National Tidal Datum Epoch (NTDE) as determined from time to time by the National Ocean Service, an office within the National Oceanic and Atmospheric Administration.

Historic or Archaeological Resources – areas identified by the Maine Historic Preservation Commission or the National Park Service as having significant value as an historic or archaeological resources and any such areas identified in the Town’s Comprehensive Plan.

Home Occupation – an occupation or profession carried out for gain by a resident or occupant and conducted as an accessory use in or about such resident’s or occupant’s dwelling or accessory structure. All home occupations are subject to the provisions of Section 15.20 of the Shoreland Zoning Ordinance regardless of whether they are located within the Shoreland Zone.

Homeowners/Landowners Association – a community association that is organized in a development in which individual owners share common interests and responsibilities in protecting and/or maintaining facilities including but not limited to roads, community water or septic systems, open space, and recreation facilities. Homeowners/landowners associations include road associations.

Household – one (1) or more individuals living as a unit in which they share the use of a dwelling unit and its facilities.

Hydric Soils – a soil that formed under conditions of saturation, flooding, or ponding long enough during the growing season to develop anaerobic conditions in the upper part.

Impermeable Surface – land area covered by structures and associated constructed facilities; land areas that have been or will be covered by a low-permeability material, such as asphalt or concrete; and land areas such as gravel roads and unpaved parking areas that have been or will be compacted through design or use to reduce their permeability. Common impermeable surfaces include roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled macadam, or other surfaces that similarly impede the natural infiltration of water.

Impermeable Surface Coverage – the portion of a lot covered by impermeable surface.

Increase in Nonconformity of a Structure – any change in a structure or property that causes further deviation from the dimensional standard(s) creating the nonconformity such as, but not limited to, reduction in water body, tributary stream or wetland setback distance, increase in impermeable surface coverage, or increase in height of a structure. Property changes or structure expansions that either meets the dimensional standard or that cause no further increase in the linear extent of nonconformance of the existing structure shall not be considered to increase nonconformity. For example, there is no increase in nonconformity with the setback requirement for water bodies, wetlands, or tributary streams if the expansion extends no further into the required setback area than does any portion of the existing nonconforming structure. Hence, a structure may be expanded laterally provided that the expansion extends no closer to the water body, tributary stream, or wetland than the closest portion of the existing structure from that water body, tributary stream, or wetland. Included in this allowance are expansions that in-fill irregularly shaped structures.

Individual Private Campsite – an area of land that:

1.

is not associated with a campground,

2.

is developed for repeated camping by only one(1) group not to exceed ten (10) individuals and

3.

involves site improvements that may include but not be limited to gravel pads, parking areas, fireplaces, or tent platforms. This does not include rudimentary campsites that are used on an occasional basis for camping by private individuals and which does not include clearing of vegetation.

Industrial – the assembling, fabrication, finishing, manufacturing, packaging, or processing of goods, or the extraction of minerals. This shall in no case include the processing of fish or marine life. Processing of such goods shall be considered an acceptable commercial fish use.

Institutional – a non-profit or quasi-public use, or institution such as a church, library, public or private school, hospital, or municipally owned or operated building, structure or land used for public purposes.

Land Use Ordinances – the Town's ordinances governing land use including the Basic Land Use Ordinance, the Shoreland Zoning Ordinance, the Subdivision Ordinance, the Town Road Ordinance, the Sign Ordinance, the Site Plan Review Ordinance, the State Junkyard Ordinance, the Solid Waste Ordinance, the Floodplain Management Ordinance, and other ordinances that may be adopted by the Town from time to time.

Liquidation Harvesting – the purchase of timberland followed by a harvest that removes most or all commercial value in standing timber, without regard for long-term forest management principles, and the subsequent sale or attempted resale of the harvested land within five (5) years.

Lot area – the area of land enclosed within the boundary lines of a lot, minus land below maximum high-water line of a water body or upland edge of a wetland and areas beneath roads serving more than two lots.

Low Impact Development (LID) – an approach to land development (or re-development) that works with nature to manage stormwater as close to its source as possible. LID employs principles such as preserving and recreating natural landscape features, minimizing impermeable surfaces to treat stormwater as a resource rather than a waste product, and include bioretention facilities, rain gardens, vegetated rooftops, rain barrels, and permeable pavements. Maine DEP – the Maine Department of Environmental Protection or any successor agency of Maine government.

Marina – a business establishment that has frontage on navigable water and, that provides, as its principal use, for hire moorings or docking facilities for boats, and that may also provide accessory services such as boat and related sales, boat repair and construction, indoor and outdoor storage of boats and marine equipment, boat and tackle shops and marine fuel service facilities. A marina does not include facilities that provide boat repair or construction as their primary or sole use and that may provide three (3) or less moorings as an accessory use.

Citizen's Note: See definition of boat repair facility.

Market Value – the estimated price a property will bring in the open market and under prevailing market conditions in a sale between a willing seller and a willing buyer, both conversant with the property and with the prevailing general price levels.

Maximum High Water Line (non-tidal waters) – that line which is apparent from visible markings changes in the character of soils due to prolonged action of the water or changes in vegetation, and that distinguishes between predominantly aquatic and predominantly terrestrial land. Areas contiguous with rivers and great ponds that support non-forested wetland vegetation and hydric soils and that are at the same or lower elevation as the water level of the river or great pond during the period of maximum high-water are considered part of the river or great pond.

Mineral Exploration – hand sampling, test boring, or other methods of determining the nature or extent of mineral resources which create minimal disturbance to the land and which include reasonable measures to restore the land to its original condition. This does not include soil analysis for subsurface waste disposal.

Mineral Extraction – any operation within any twelve (12) month period which removes more than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material from its natural location and transports the product removed, away from the extraction site. This is in no way meant to construe excavation for permitted uses or structures.

Minimum Lot Width – the closest distance between the side lot lines of a lot.

Mobile Food Handlers – any person selling or offering for sale, food products within the Town from a mobile unit, and where delivery is made at the time of sale.

Mobile Unit – a mobile, temporary or non-permanent vending unit that is capable of being moved from place to place.

Multi-Unit Residential Use – a residential dwelling containing three (3) or more dwelling units.

Native – indigenous to the local forests.

Natural Areas and Natural Communities, Unique Natural Areas and Natural Communities – areas identified by a governmental agency such as the Maine Department of Conservation Natural Areas Program as having significant value as a natural area and any areas identified in the Town’s comprehensive plan.

Noise Control Plan – a document that demonstrates how the noise impacts from a development will be minimized including:

1.

A description of the proposed development including the identification of major sound sources, including tonal sound sources (rumbles, hums, whines, whistles, squeals), associated with the construction, operation, and maintenance of the proposed development and the proposed hours of operation;

2.

The location of the sound sources shown on the site plan for the development;

3.

Maps and descriptions of the land uses, zoning districts and existing sources of sound for the area potentially affected by sounds from the development. These maps and descriptions shall be adequate to describe the potentially affected area around the development and shall have a minimum coverage of one thousand (1,000) feet in all directions from the boundary of the Mitchell Field Marine Business District;

4.

A description of day and night equivalent sound levels expected to be produced at the boundary of the Mitchell Field Marine Business District both as individual and combined sound sources.

5.

Manufacturers’ specifications for machinery that has potential to be heard beyond the boundary of the Mitchell Field Marine Business District.

6.

A description of any proposed noise control measures including their location and expected performance.

Noise Reducing Site Design – a site design for development in the Mitchell Field Marine Business District that controls noise impacts through the design and placement of structures and other improvements on the site including, but not limited to, the use of buffers including walls and fences, and/or the location of service areas and loading docks, exhaust fans, machinery and equipment, overhead doors, areas where trucks back-up, and other noise generating area so they do not face the ocean or the nearest point on the boundary of the Mitchell Field Marine Business District.

Nonconforming Condition – nonconforming lot, structure or use that is allowed solely because it was in lawful existence at the time this Ordinance or subsequent amendment took effect.

Nonconforming Lot – a single lot(s) of record which, at the effective date of adoption or amendment of this Ordinance, does not meet the area, frontage, or width requirements of the district in which it is located, but which is allowed solely because it was in lawful existence and was recorded in the Cumberland County Registry of Deeds at the time that this Ordinance or subsequent amendments took effect.

Nonconforming Structure – a structure which does not meet any one (1) or more of the following dimensional requirements; setback, height, footprint or impermeable surface coverage, but which is allowed solely because it was in lawful existence at the time this Ordinance or subsequent amendments took effect.

Nonconforming Use – use of buildings, structures, premises, land or parts thereof that is not allowed in the district in which it is situated, but that is allowed solely because it was in lawful existence at the time this Ordinance or subsequent amendments took effect.

Non-Native Invasive Species of Vegetation – species of vegetation listed by the Maine Department of Agriculture, Conservation and Forestry as being invasive in Maine ecosystems and not native to Maine ecosystems.

Nuisance – any violation of this ordinance.

Odor Control Plan – a document that demonstrates how the odor impacts from a development will be minimized including:

1.

A description of the proposed development including the identification of major odor sources associated with the construction, operation, and maintenance of the proposed development and the proposed hours of operation;

2.

The location of the odor sources shown on the site plan for the development;

3.

Maps and descriptions of the land uses, zoning districts and existing sources of odors for the area potentially affected by odors from the development. These maps and descriptions shall be adequate to describe the potentially affected area around the development and shall have a minimum coverage of one thousand (1,000) feet in all directions from the boundary of the Mitchell Field Marine Business District;

4.

A description of any proposed odor control measures including their location and expected performance.

Offshore Island – islands not connected to any other land by road and/or are accessible only by water or air at mean high tide.

One-Unit Residential Use – a residential dwelling containing one (1) dwelling unit.

Open Fence – a fence through which water, wind and sand can easily move, for example, a split rail.

Open Space – an area of land in a predominately undeveloped condition.

Open Space, Common – conservation and/or recreation land within a subdivision that is owned by the residents of the subdivision in common or by a homeowners association and that is protected from future development by a conservation easement or similar legally binding restriction.

Open Space, Protected – conservation and/or recreation land within a subdivision that is owned by the Town, state or federal agency, conservation organization or land trust, or private owner and that is protected from future development by a conservation easement or similar legally binding restriction.

Organic Fertilizer – a product that is derived from the remains or by products of animals or vegetables which contain the essential nutrients for plant growth.

Outlet Stream – any perennial or intermittent stream, as shown on the most recent highest resolution version of the national hydrography dataset available from the United States Geological Survey on the website of the United States Geological Survey or the national map, that flows from a freshwater wetland.

Perennial Stream – a free-flowing body of water which contains water at all times except during extreme drought.

Permanent Marker – a marker that, if left undisturbed, will remain in place for a period of at least twenty-five (25) years.

Person – an individual, corporation, governmental agency, municipality, trust, estate, partnership, association, two or more individuals having joint or common interest, or other legal entity.

Piers, docks, wharves, bridges and other structures and uses extending over or beyond the maximum high-water line or within a wetland.

Temporary – structures that remain in or over the water for less than seven (7) months in any period of twelve (l2) consecutive months.

Permanent – structures that remain in or over the water for seven (7) months or more in any period of twelve (l2) consecutive months.

Pond – any inland body of water that in a natural state has a surface area less than ten (10) acres, or a body of water artificially formed or increased with a surface area less than thirty (30) acres excluding farm ponds, fire ponds, stormwater retention ponds, or landscape ponds and similar small man-made areas.

Primary Conservation Area – land within a subdivision that is not suitable for development or intensive use due to the presence of natural resource constraints. This includes coastal and freshwater wetlands, significant vernal pools, undeveloped land within the 100-year floodplain, land within one hundred (100) feet of the upland edge of a freshwater wetland, and contiguous areas of one (1) acre or more with a slope of more than twenty-five percent (25%).

Principal Structure – a structure other than one that is used for purposes wholly incidental or accessory to the use of another structure or use on the same lot.

Principal Use – a use other than one (1) that is wholly incidental or accessory to another use on the same lot.

Public Facility – any facility, including but not limited to, buildings, property, recreation areas, and roads, which are owned, leased, or otherwise operated, or funded by a governmental body or public entity.

Qualified Buyers – persons who meet the income requirements of a very low, low or moderate income household and who purchase Workforce Housing Lots or Units.

Recent Flood Plain Soils – the following soil series as described and identified by the National Cooperative Soil Survey:

AlluvialCornishCharles
FryeburgHadleyLimerick
LovewellMedomakOndava
PodunkRumneySaco
SuncookSundayWinooski

Recreational Facility – a place designed and equipped for the conduct of sports, leisure time activities, and other customary and usual recreational activities, excluding boat launching facilities.

Recreational Vehicle – a vehicle or an attachment to a vehicle designed to be towed, and designed for temporary sleeping or living quarters for one (1) or more persons, and which may include a pick-up camper, travel, tent trailer, camp trailer, and motor home. In order to be considered as a vehicle and not as a structure, the unit must remain with its tires on the ground, and must be registered with the State Division of Motor Vehicles.

Replacement Subsurface Wastewater Disposal System – a system intended to replace:

1.

an existing system which is either malfunctioning or being upgraded with no significant change of design flow or use of the structure, or

2.

any existing overboard wastewater discharge.

Residential – a land use that is predominated by a dwelling or dwelling units.

Re-Subdivision – the division of an existing subdivision previously approved by the Town or any change of lot size therein or the relocation of any road or lot in a subdivision previously approved by the Town.

Riprap – rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit vertical or less.

River – a free-flowing body of water including its associated floodplain wetlands from that point at which it provides drainage for a watershed of twenty-five (25) square miles to its mouth.

Road – any one of the following vehicular access ways:

Arterial Road – a road that is functionally classified by the Maine Department of Transportation (DOT) as an arterial, with controlled access, traffic signals at important intersections and/or stop signs on side roads.

Collector Road – a road that is functionally classified as a collector by the Maine Department of Transportation (DOT), and that collects traffic from local roads and connects with arterial roads.

Local Road – a public road or private road, other than arterial or collector roads.

Private Road – a road that is privately owned, built, and maintained, but not including a driveway.

Citizen’s Note: The town may not, under Maine law, spend public funds to construct, repair, maintain or plow privately owned roads.

Public Road – a public easement or town way.

Public Easement – an easement held by the municipality for purposes of public access to land or water not otherwise connected to a public way, and includes the rights enjoyed by the public with respect to private ways created by statute prior to July 29, 1976, pursuant to 23 M.R.S. § 3012(2).

Town Way – an area of land designated and held by a municipality for passage and use of the general public by motor vehicle; all town or county ways not discontinued or abandoned before July 29, 1976; and all state or state aid highways, or both, which are classified town ways as of July 1, 1982, or thereafter, pursuant to 23 M.R.S. § 53.

Road Association – see homeowners/landowners association.

Salt Marsh – areas along coastal wetland (most often along coastal bays) that support salt tolerant species, and where at average high tide during the growing season, the soil is irregularly inundated by tidal waters. The predominant species is saltmarsh cordgrass (Spartina alterniflora). More open areas often support widgeon grass, eelgrass, and Sago pondweed.

Salt Meadow – areas which support salt tolerant plant species bordering the landward side of salt marshes or open coastal water, where the soil is saturated during the growing season but which is inundated by tidal water. Indigenous plant species include salt meadow cordgrass (Spartina patens) and black rush; common threesquare occurs in fresher areas.

Sapling – a tree species that is less than two (2) inches in diameter at four and one half (4.5) feet above ground level.

Secondary Conservation Area – land within a subdivision that has natural resource, open space, scenic, or cultural value but that is potentially developable. These areas should be considered for protection in the design and layout of the subdivision including being part of the common or protected open space in a Flexible Lot Size subdivision. These areas include land that has been identified for protection or special treatment in the comprehensive plan, open space plan or other official Town document.

Seedling – a young tree that is less than four and one half (4.5) feet in height above ground level.

Service Drop – any utility line extension which does not cross or run beneath any portion of a water body provided that:

1.

in the case of electric service

a)

the placement of wires and/or installation of utility poles is located entirely upon the premises of the customer requesting service or upon a roadway right-of-way: and

b)

the total length of the extension is less than one thousand (1,000) feet.

2.

in the case of telecommunication service

a)

the extension, regardless of length, will be made by the installation of telecommunication wires and cables to existing utility poles, or

b)

the extension requiring the installation of new utility poles or placement underground is less than one thousand (l,000) feet in length.

Setback –

Property, Side, Rear or Lot Line Setback – the minimum horizontal distance from a lot line or edge of the traveled way, whichever is more restrictive, to the nearest part of a structure.

Road Setback – the minimum horizontal distance from the edge of the traveled way to the nearest part of a structure.

Water Body, Shorefront or Wetland Setback – the nearest horizontal distance from the maximum high-water line of a water body, tributary stream, or upland edge of a wetland to the nearest part of a structure, road, parking space or other regulated object or area.

Shoreland Zone – the land area located within two hundred fifty (250) feet, horizontal distance, of the maximum high water line of any great pond or salt water body; within two hundred fifty (250) feet, horizontal distance, of the highest astronomical tide elevation of any coastal wetland, within two hundred fifty (250) feet, horizontal distance, of the upland edge of a coastal wetland, or the upland edge of a freshwater wetland of ten (l0) or more contiguous acres, or the upland edge of a freshwater wetland of less than ten (l0) contiguous acres and adjacent to a surface water body, excluding any tributary stream, such that in a natural state, the combined surface area is in excess of ten (l0) acres; and within seventy five (75) feet horizontal distance of the maximum high water line of a stream. The Shoreland Zone also includes the portion of the Mitchell Field Marine Business District as shown on the Official Shoreland Zoning Map that is more than two hundred fifty (250) feet, horizontal distance, from the upland edge of the coastal wetland.

Slash – (only for activities not involving timber harvesting) the residue, e.g., treetops and branches, left on the ground after a timber harvest.

Sludge – a solid, semisolid, or liquid residue that results after sewage (human and other waste from households and industries) is treated at a sewage plant.

Sound Insulated Structure – a building, structure, or equipment enclosure that limits the exterior sound level of machinery, equipment or activities located therein to not more than fifty five (55) dBA based on a one-minute equivalent sound level L-Aeq 1-minute when measured at a distance of ten (10) feet from the exterior walls or roof of the structure or enclosure.

Special Waste – any material(s) included within the definition of special waste contained in Chapter 400, Section 1, subsection (Nnn) of the Maine Department of Environmental Protection (DEP) Rules, adopted pursuant to 38 M.R.S. Sections 341-D, 1304, 1310-N(9) and 1301 et Seq., as such rules may be amended from time to time.

Stream – a free-flowing body of water from the outlet of great pond or the confluence of two (2) perennial streams as depicted on the most recent, highest resolution version of the national hydrography dataset available from the United States Geological Survey on the website of the United States Geological Survey or the national map to the point where the stream becomes a river or where the stream meets the shoreland zone of another water body or wetland. When a stream meets the shoreland zone of a water body or wetland and a channel forms downstream of the water body or wetland as an outlet that channel is also a stream.

Storm-Damaged Tree – a tree that has been uprooted, blown down, is lying on the ground, or that remains standing and is damaged beyond the point of recovery as the result of a storm event.

Stormwater – the part of precipitation, including runoff from rain or melting snow, that flows across the surface as sheet flow, shallow concentrated flow, or in drainage ways.

Structure – anything built for the support, shelter or enclosure of persons, animals, goods or property of any kind, together with anything constructed or erected with a fixed location on or in the ground, exclusive of tree houses with no roof, not to exceed twenty-five (25) square feet; picnic tables; lawn chairs; flag poles; temporary party tents not to exceed three (3) days; ninety-six (96) square feet camping tents that are accessory to a legally existing house and that are erected on the property not more than ten (10) days per calendar year; dog houses not to exceed ten (10) square feet; swimming pools not to exceed ten (10) square feet; fences and poles, wiring, and other equipment normally associated with service drops as well as guying and guy anchors. The term includes, but is not limited to, structures temporarily or permanently located, such as decks, satellite dishes, portable prefab structures, terraces, patios and other construction involving impermeable and/or non-vegetated surfaces. A subsurface waste water disposal systems as defined in Title 30-A, section 4201, subsection 5; a geothermal heat exchange wells as defined in Title 32, section 4700-E, subsection 3-C; or wells or water wells as defined in Title 32, section 4700-E, subsection 8 are not structures.

Subdivision – the division of a tract or parcel of land into three (3) or more lots within any five (5) year period in accordance with 30-A M.R.S.A. §4401[4] and as that Subsection may be amended from time to time.

Major subdivision – is the division of a tract or parcel of land into five (5) or more lots within any five (5) year period or any subdivision that triggers State Site Location of Development review.

Minor subdivision – is the division of a tract or parcel of land into four (4) or fewer lots within any five (5) year period and which does not trigger State Site Location of Development review.

Substantial/Substantial Start of/Construction – substantial construction of an individual structure means completion of the foundation and capping over for water tightness. Where there will be no foundation or no structure is proposed, substantial start means completion of at least thirty percent (30%) of the value of the work for which a building or other permit has been secured. In the case of a subdivision, substantial start means the completion of no less than thirty percent (30%) of the costs of proposed improvements within a subdivision. If the subdivision is to consist of individual lots to be sold or leased, the cost of construction of buildings on those lots shall not be included. When the construction involves use of a slab as the foundation, the slab must be completed within one (1) year of the date on which the permit or approval was granted and a permanent roof completed within two (2) years of the date on which the permit or approval was granted.

Subsurface Sewage Disposal System – any system designed to dispose of waste or waste water on or beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields; grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism, or apparatus used for those purposes; does not include any discharge system licensed under 38 M.R.S.A. § 414, as may be amended from time to time, any surface waste water disposal system, or any municipal or quasi-municipal sewer or waste water treatment system.

Sustained Slope – a change in elevation where the referenced percent grade is substantially maintained or exceeded throughout the measured area.

Tidal waters – all waters affected by tidal action during the highest annual tide (HAT).

Timber Harvesting – the cutting and removal of timber for the primary purpose of selling or processing forest products. Timber harvesting does not include the cutting or removal of vegetation within the shoreland zone when associated with any other land use activities. The cutting or removal of trees on a lot that has less than two (2) acres shall not be considered timber harvesting. Such cutting or removal of trees shall be regulated pursuant to Section 15.15, Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting of the Shoreland Zoning Ordinance or Section 11.15 Vegetative Buffers of the Basic Land Use Ordinance.

Tree – a woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at four and one half (4.5) feet above ground, with a more or less definite crown, and reaching a height of at least ten (10) feet at maturity.

Tributary Stream – means a channel between defined banks created by the action of surface water, which is characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and which is connected hydrologically with other water bodies. “Tributary stream” does not include rills or gullies forming because of accelerated erosion in disturbed soils where the natural vegetation cover has been removed by human activity. This definition does not include the term “stream” as defined elsewhere in this ordinance and applies only to that portion of the tributary stream located within the shoreland zone of the receiving water body or wetland.

Two-Acre Lot Size Subdivision – a subdivision approved in accordance with Section 9.4.1 of the Subdivision Ordinance in which the size of all lots is a minimum of eighty thousand (80,000) square feet.

Two-Unit Residential Use – a residential dwelling containing two (2) dwelling units.

Upland Edge of a Wetland – the boundary between upland and wetland. For purposes of a coastal wetland, this boundary is the line formed by the landward limits of the salt tolerant vegetation and/or the highest astronomical tide, including all areas affected by tidal action. For purposes of a freshwater wetland, the upland edge is formed where the soils are not saturated for a duration sufficient to support wetland vegetation; or where the soils support the growth of wetland vegetation, but such vegetation is dominated by woody stems that are six (6) meters (approximately twenty (20) foot) tall or taller.

Vegetation – all live trees, shrubs, other plants, and ground cover including without limitation, trees both over and under four (4) inches in diameter, measured at four and a half (4.5) feet above ground level.

Vernal Pool – a natural, temporary to semi-permanent body of water occurring in a shallow depression that typically fills during the spring or fall and may dry during the summer. Vernal pools have no permanent inlet or outlet and no viable populations of predatory fish. A vernal pool may provide the primary breeding habitat for wood frogs (Rana sylvatica), spotted salamanders (Ambystoma maculatum), blue-spotted salamanders (Ambystoma laterale), and fairy shrimp as well as valuable habitat for other plants and wildlife, including several rare, threatened, and endangered species. A vernal pool intentionally created for the purposes of compensatory mitigation is included in this definition.

Vernal Pool, Significant – a vernal pool that is determined to be significant under the standards of the Maine Natural Resources Protection Act based on the number and type of pool-breeding amphibian egg masses in a pool, or the presence of fairy shrimp (Eubranchipusspp.) or use by threatened or endangered species.

Volume of a Structure – the volume of all portions of a structure enclosed by roof and fixed exterior walls as measured from the exterior faces of these walls and roof.

Water body – any river, stream, great pond, tidal or open salt water area.

Water Crossing – any project extending from one bank to the opposite bank of a river, stream, or tributary stream or wetland, whether under, through, or over the water or wetland. Such projects include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables as well as maintained work on these crossings. This definition includes crossings for timber harvesting equipment and related activities.

Wastewater – water carrying wastes from homes, businesses, and industries that is a mixture of water and other liquids and dissolved or suspended solids, or excess irrigation water that is runoff to adjacent land. Wastewater includes septage as well as "gray water."

Wetland –

Coastal Wetland – all tidal and subtidal lands; all lands with vegetation present that is tolerant of salt water and occurs primarily in a salt water or estuarine habitat; any salt swamp, marsh, bog, beach, flat, meadow or other contiguous low land that is subject to tidal action during the highest tide level for the year in which an activity is proposed as identified in tide tables published by the National Ocean Service. Coastal wetlands may include portions of coastal sand dunes.

Forested Wetland – a fresh water wetland dominated by woody vegetation that is six (6) meters (approximately twenty (20) feet) or taller.

Freshwater Wetlands –

When this term is found in the Subdivision Ordinance, “freshwater wetlands” means freshwater swamps, marshes, bogs and similar areas, other than forested wetlands, which are inundated or saturated by surface or ground water at a frequency and for a duration sufficient to support, and which under normal circumstances do support, a prevalence of wetland vegetation typically adapted for life in saturated soils.

When this term is found in the Basic Land Use Ordinance, the Shoreland Zoning Ordinance, or the Site Plan Review Ordinance, “freshwater wetlands” means freshwater swamps, marshes, bogs and similar areas, other than forested wetlands, which are:

(1)

Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a surface water body, excluding any tributary stream, such that in a natural state, the combined surface area is in excess of 10 acres; and

(2)

Inundated or saturated by surface or ground water at a frequency and for a duration sufficient to support, and which under normal circumstances do support, a prevalence of wetland vegetation typically adapted for life in saturated soils.

Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to the criteria of this definition.

The following three (3) criteria shall be met for classification as a freshwater wetland:

1.

a predominance of hydric soils,

2.

a prevalence of hydrophytic vegetation typically adapted for life in saturated soils, and

3.

anaerobic conditions in the soil usually created by inundation or saturation by surface or groundwater for at least one (1) week of the growing season.

The absence of any one (1) of these three (3) criteria shall preclude classification as freshwater wetland.

Moderate or high value wetlands means wetlands that are defined as moderate or high value for wildlife as defined by the Maine Department of Inland Fisheries and Wildlife or as determined by the Town.

Citizen's Note: This Ordinance defines freshwater wetlands in conformance with the Federal Manual for Identifying and Delineating Jurisdictional Wetlands, an Interagency Cooperative Publication of the Fish and Wildlife Service, Environmental Protection Agency, Department of the Army, and Soil Conservation Service, to which all applicants are referred for additional information.

Wildlife Habitat, Significant Wildlife Habitat – areas identified by a government agency such as the Maine Department of Inland Fisheries and Wildlife (IFW) as having significant value as habitat for animals and any areas identified in the Town’s comprehensive plan.

Woody Vegetation – live trees or woody, non-herbaceous shrubs.

Workforce Housing – housing designed with the express intent of providing owner-occupied decent, safe, and sanitary living accommodations that are affordable to lower income households and moderate income households, in accordance with the following definitions:

Very low income household – a household with a gross income less than or equal to fifty percent (50%) of the Brunswick Labor Market Area.

Low income household – a household with a gross income over fifty percent (50%), but less than or equal to eighty percent (80%), of the Brunswick Labor Market Area.

Moderate income household – a household with a gross income more than eighty percent (80%), but less than or equal to one hundred twenty percent (120%), of the Brunswick Labor Market Area.

Workforce Housing Covenant – an agreement for the development of a Workforce Housing Lot or Workforce Housing Unit which legally and permanently restricts the ownership and use of such Workforce Housing Lot or Workforce Housing Unit. Such agreement shall be between the Town and the applicant and shall be recorded in the Cumberland County Registry of Deeds prior to the issuance of a building permit, if for a single Workforce Housing Lot or Unit, or concurrently with the recording of any approved subdivision plan that includes a Workforce Housing Lot or Unit, if for a subdivision.

Workforce Housing Fund – a separate dedicated reserve account established by Town Meeting to be managed at the direction of the Board of Selectmen (BOS) for the receipt and management, in accordance with the provisions of the Basic Land Use Ordinance (BLUO) on Workforce Housing, of the following: gifts of land, housing, and other property useful in the administration of Section 11.18 of the Basic Land Use Ordinance, as may be amended from time to time; grants; and monetary donations. The Workforce Housing Fund shall be utilized solely for the construction, acquisition, and maintenance of Workforce Housing as defined herein and for the cost of administering workforce housing programs consistent with the Workforce Housing provisions of the Basic Land Use Ordinance, as may be amended from time to time.

Workforce Housing Lot – a residential lot of land for owner-occupied single family residential use that has been permanently protected for long term affordability by means of a covenant or other mechanism that includes an Equity Recapture formula which is recorded in the Cumberland County Registry of Deeds.

Workforce Housing Unit – a residential structure on a lot of land for owner-occupied single family residential use that has been permanently protected for long term affordability by means of a covenant or other mechanism that includes an Equity Recapture formula which is recorded in the Cumberland County Registry of Deeds.

Yard Sale – the sale of goods from a residential premises, whether advertised in local media, by signs, or otherwise, as a yard sale, barn sale, garage sale, household sale, moving sale, or other sale, whether accomplished by direct sale or auction; or the sale, at the seller’s place of residence, of all or part of the household goods, whether accomplished by direct sale or auction; or sales conducted by civic groups, school groups, church groups, charitable or fraternal organizations and other non-profit organizations if such sale is held on the organization’s premises.

The official code of record is maintained by the Town Clerk.

Text current through March 14, 2026