§ 197.729 Local government encouragement of microgrids.
Oregon Revised Statutes ORS chapter 197
ORS sections in this chapter were amended or repealed by the Legislative Assembly during its 2026 regular session. See the table of ORS sections amended or repealed during the 2026 regular session: 2026 A&R Tables
New sections of law were added by legislative action to this ORS chapter or to a series within this ORS chapter by the Legislative Assembly during its 2026 regular session. See sections in the following 2026 Oregon Laws chapters: 2026 Session Laws 0089
As used in this section:
“Community microgrid” means a microgrid that is located within a geographical area that a local government designates as a microgrid zone under this section.
“Consumer-owned utility,” “electric company” and “governing body” have the meanings given those terms in ORS 757.600.
“Microgrid” means a group of interconnected loads and distributed energy resources within clearly defined electrical boundaries that functions as a single controllable system, irrespective of whether the microgrid is operating independently of or in conjunction with an electric grid.
A local government may:
Adopt land use regulations that correspond to microgrid zones to encourage development that is compatible with microgrids and community microgrids.
Designate a geographical area based on existing electric service infrastructure located within the jurisdiction of the local government as a microgrid zone, subject to the approval of:
The Public Utility Commission, if the microgrid zone is located within the service territory of an electric company; or
The governing body of a consumer-owned utility, if the microgrid zone is located within the service territory of a consumer-owned utility.
Enter into an intergovernmental agreement with one or more local governments to designate a geographical area based on existing electric service infrastructure located within and across the jurisdictions of the local governments as a microgrid zone, subject to the approval of:
The commission, if the microgrid zone is located within the service territory of an electric company; or
The governing body of a consumer-owned utility, if the microgrid zone is located within the service territory of a consumer-owned utility.
[2025 c.472 §7]